0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Bridge over the motorway A27, steel truss with a FRP deck

 Bridge over the motorway A27, steel truss with a FRP deck
Auteur(s): ,
Présenté pendant IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, publié dans , pp. 1583-1590
DOI: 10.2749/222137815818358952
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.08 MB

In the Netherlands a bridge is built crossing the motorway A27 near Utrecht. This bridge was constructed as a combination of steel and FRP, with a total length of 140 meters. The bridge is made of ...
Lire plus

Détails bibliographiques

Auteur(s): (Movares, Utrecht, the Netherlands)
(Movares, Utrecht, the Netherlands)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Publié dans:
Page(s): 1583-1590 Nombre total de pages (du PDF): 8
Page(s): 1583-1590
Nombre total de pages (du PDF): 8
Année: 2015
DOI: 10.2749/222137815818358952
Abstrait:

In the Netherlands a bridge is built crossing the motorway A27 near Utrecht. This bridge was constructed as a combination of steel and FRP, with a total length of 140 meters. The bridge is made of a steel truss girder and a deck of FRP (composite).The connection of the composite deck to the steel truss girder was a challenging part. To solve this problem two load-paths are introduced. The first is made with an adhesive compound, the second with a pin-hole connection. Also the location of the bridge with the foundation inside a polder construction with highly compressible soil was a challenge to solve. The use of a jet grouting was necessary to solve this problem.

Mots-clé:
acier pont

Ouvrages et projets