Bridge over the motorway A27, steel truss with a FRP deck
|
Bibliografische Angaben
Autor(en): |
Arjen Steenbrink
(Movares, Utrecht, the Netherlands)
Gijs Kaptein (Movares, Utrecht, the Netherlands) |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015 | ||||
Veröffentlicht in: | IABSE Conference Geneva 2015 | ||||
|
|||||
Seite(n): | 1583-1590 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2015 | ||||
DOI: | 10.2749/222137815818358952 | ||||
Abstrakt: |
In the Netherlands a bridge is built crossing the motorway A27 near Utrecht. This bridge was constructed as a combination of steel and FRP, with a total length of 140 meters. The bridge is made of a steel truss girder and a deck of FRP (composite).The connection of the composite deck to the steel truss girder was a challenging part. To solve this problem two load-paths are introduced. The first is made with an adhesive compound, the second with a pin-hole connection. Also the location of the bridge with the foundation inside a polder construction with highly compressible soil was a challenge to solve. The use of a jet grouting was necessary to solve this problem. |
||||
Stichwörter: |
Stahl Brücke Verbund CFK Düsenstrahlverfahren Hybrid
|