0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Applied Research on BIM Design for One Abnormity Cable Stayed Bridge in Hengqin Zhuhai

The Applied Research on BIM Design for One Abnormity Cable Stayed Bridge in Hengqin Zhuhai
Author(s):



Medium: conference paper
Language(s): English
Conference: IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017
Published in:
Page(s): 171-172
Year: 2017
DOI: 10.2749/222137817821232405
Abstract:

One cable stayed bridge named Yiyi in Hengqin new district of Zhuhai City in South China was chosen as a research case, some research works of BIM technology in the preliminary design were carried out, a new method of BIM technology application based on XML format for information classification storage and transmission was proposed.

Keywords:
cable stayed bridge BIM Technology life-cycle management in bridge storage and transmission XML format
Download preview file (PDF)
0.12 MB
  • About this
    data sheet
  • Reference-ID
    10292860
  • Published on:
    27/01/2019
  • Last updated on:
    21/05/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine