0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

The Applied Research on BIM Design for One Abnormity Cable Stayed Bridge in Hengqin Zhuhai

The Applied Research on BIM Design for One Abnormity Cable Stayed Bridge in Hengqin Zhuhai
Autor(en):



Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017
Veröffentlicht in:
Seite(n): 171-172
Jahr: 2017
DOI: 10.2749/222137817821232405
Abstrakt:

One cable stayed bridge named Yiyi in Hengqin new district of Zhuhai City in South China was chosen as a research case, some research works of BIM technology in the preliminary design were carried out, a new method of BIM technology application based on XML format for information classification storage and transmission was proposed.

Vorschau herunterladen (PDF-Datei)
0.12 MB
  • Über diese
    Datenseite
  • Reference-ID
    10292860
  • Veröffentlicht am:
    27.01.2019
  • Geändert am:
    21.05.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine