0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

The Applied Research on BIM Design for One Abnormity Cable Stayed Bridge in Hengqin Zhuhai

The Applied Research on BIM Design for One Abnormity Cable Stayed Bridge in Hengqin Zhuhai
Auteur(s):



Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017
Publié dans:
Page(s): 171-172
Année: 2017
DOI: 10.2749/222137817821232405
Abstrait:

One cable stayed bridge named Yiyi in Hengqin new district of Zhuhai City in South China was chosen as a research case, some research works of BIM technology in the preliminary design were carried out, a new method of BIM technology application based on XML format for information classification storage and transmission was proposed.

Télécharger l'aperçu (fichier PDF)
0.12 MB
  • Informations
    sur cette fiche
  • Reference-ID
    10292860
  • Publié(e) le:
    27.01.2019
  • Modifié(e) le:
    21.05.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine