Zhitian Yang
- Optimized flowshop scheduling of multiple production lines for precast production. In: Automation in Construction, v. 72 (December 2016). (2016):
- Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete components. In: Automation in Construction, v. 95 (November 2018). (2018):