Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete components
Author(s): |
Zhiliang Ma
Zhitian Yang Shilong Liu Song Wu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, November 2018, v. 95 |
Page(s): | 86-97 |
DOI: | 10.1016/j.autcon.2018.08.002 |
- About this
data sheet - Reference-ID
10191204 - Published on:
01/12/2018 - Last updated on:
01/12/2018