0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Optimized flowshop scheduling of multiple production lines for precast production

Author(s):


Medium: journal article
Language(s): English
Published in: Automation in Construction, , v. 72
Page(s): 321-329
DOI: 10.1016/j.autcon.2016.08.021
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2016.08.021.
  • About this
    data sheet
  • Reference-ID
    10190869
  • Published on:
    10/12/2018
  • Last updated on:
    10/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine