0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Zhang, Yakun / Gong, Guofang / Yang, Huayong / Li, Wenjing / Liu, Jian (2020): Precision versus intelligence: Autonomous supporting pressure balance control for slurry shield tunnel boring machines. In: Automation in Construction, v. 114 (June 2020).

    https://doi.org/10.1016/j.autcon.2020.103173

  2. Xie, Haibo / Liu, Feng / Fan, Yurun / Yang, Huayong / Chen, Jian / Zhang, Jin / Zuo, Chungen (2013): Workability and proportion design of pumping concrete based on rheological parameters. In: Construction and Building Materials, v. 44 (July 2013).

    https://doi.org/10.1016/j.conbuildmat.2013.02.051

  3. Shi, Hu / Yang, Huayong / Gong, Guofang / Wang, Lintao (2011): Determination of the cutterhead torque for EPB shield tunneling machine. In: Automation in Construction, v. 20, n. 8 (December 2011).

    https://doi.org/10.1016/j.autcon.2011.04.010

  4. Wang, Lintao / Gong, Guofang / Shi, Hu / Yang, Huayong (2012): Modeling and analysis of thrust force for EPB shield tunneling machine. In: Automation in Construction, v. 27 (November 2012).

    https://doi.org/10.1016/j.autcon.2012.02.004

  5. Xie, Haibo / Duan, Xiaoming / Yang, Huayong / Liu, Zhibin (2012): Automatic trajectory tracking control of shield tunneling machine under complex stratum working condition. In: Tunnelling and Underground Space Technology, v. 32 (November 2012).

    https://doi.org/10.1016/j.tust.2012.06.002

  6. Shi, Hu / Yang, Huayong / Gong, Guofang / Liu, Huaiyin / Hou, Dianqing (2014): Energy saving of cutterhead hydraulic drive system of shield tunneling machine. In: Automation in Construction, v. 37 (January 2014).

    https://doi.org/10.1016/j.autcon.2013.09.002

  7. Xu, Bing / Cheng, Min / Yang, Huayong / Zhang, Junhui / Mao, Zebing / Wang, Di / Yue, Yiming (2014): An automatic three-dimensional loading apparatus for static tests of truss joints. In: Automation in Construction, v. 48 (December 2014).

    https://doi.org/10.1016/j.autcon.2014.08.005

  8. Wang, Lintao / Sun, Wei / Gong, Guofang / Yang, Huayong (2017): Electro-hydraulic control of high-speed segment erection processes. In: Automation in Construction, v. 73 (January 2017).

    https://doi.org/10.1016/j.autcon.2016.08.037

Search for a publication...

Only available with
My Structurae

Full text