Huayong Yang
- Precision versus intelligence: Autonomous supporting pressure balance control for slurry shield tunnel boring machines. In: Automation in Construction, v. 114 (June 2020). (2020):
- Workability and proportion design of pumping concrete based on rheological parameters. In: Construction and Building Materials, v. 44 (July 2013). (2013):
- Determination of the cutterhead torque for EPB shield tunneling machine. In: Automation in Construction, v. 20, n. 8 (December 2011). (2011):
- Modeling and analysis of thrust force for EPB shield tunneling machine. In: Automation in Construction, v. 27 (November 2012). (2012):
- Automatic trajectory tracking control of shield tunneling machine under complex stratum working condition. In: Tunnelling and Underground Space Technology, v. 32 (November 2012). (2012):
- Energy saving of cutterhead hydraulic drive system of shield tunneling machine. In: Automation in Construction, v. 37 (January 2014). (2014):
- An automatic three-dimensional loading apparatus for static tests of truss joints. In: Automation in Construction, v. 48 (December 2014). (2014):
- Electro-hydraulic control of high-speed segment erection processes. In: Automation in Construction, v. 73 (January 2017). (2017):