- Analysis of the Impact of Government-Supplied Material Purchase Contracts with On-site Installation on Construction Market. In: KSCE Journal of Civil Engineering, v. 27, n. 12 (October 2023). (2023):
- Determination of optimal accelerometer locations using modal sensitivity for identifying a structure. In: Smart Structures and Systems, v. 4, n. 5 (September 2008). (2008):
- Enhancing Education of Construction Materials Course Using Guided Inquiry Modules Instruction. In: Journal of Professional Issues in Engineering Education and Practice, v. 139, n. 1 (January 2013). (2013):
- Study of Satisfaction Levels on Construction Engineering Education in Cyber University and Its Improvements. In: KSCE Journal of Civil Engineering, v. 23, n. 2 (January 2019). (2019):
- Comparison of Efficiency and Satisfaction Level on Different Construction Management Methods for Public Construction Projects in Korea. In: KSCE Journal of Civil Engineering, v. 23, n. 6 (May 2019). (2019):
- Logistic Regression Modeling to Determine Projects impacted by Schedule Compression. In: KSCE Journal of Civil Engineering, v. 23, n. 4 (March 2019). (2019):
- Identification of IT application areas and potential solutions for perception enhancement to improve construction safety. In: KSCE Journal of Civil Engineering, v. 18, n. 2 (January 2014). (2014):
- Simulation technique-based sensitivity analysis on staircase construction process in high-rise building construction. In: KSCE Journal of Civil Engineering, v. 18, n. 2 (January 2014). (2014):
- Study on the issues of the lowest bidding through the analysis of working budget ratio of Korean construction companies. In: KSCE Journal of Civil Engineering, v. 21, n. 5 (August 2016). (2016):
- Development of budget-constrained rescheduling method in mega construction project. In: KSCE Journal of Civil Engineering, v. 21, n. 1 (May 2016). (2016):
- Approximate cost estimating model for river facility construction based on case-based reasoning with genetic algorithms. In: KSCE Journal of Civil Engineering, v. 16, n. 3 (February 2012). (2012):
- Simulation analysis of labor performance during overtime and impact on project duration. In: KSCE Journal of Civil Engineering, v. 20, n. 7 (January 2016). (2016):
- Identification of applications of mobile devices to improve airport BHS maintenance. In: KSCE Journal of Civil Engineering, v. 18, n. 5 (May 2014). (2014):
- Approximate cost estimating model of eco-type trade for river facility construction using case-based reasoning and genetic algorithms. In: KSCE Journal of Civil Engineering, v. 17, n. 2 (March 2013). (2013):
- Flexible Work Breakdown Structure for Integrated Cost and Schedule Control. In: Journal of Construction Engineering and Management, v. 130, n. 5 (October 2004). (2004):
- Framework of the approximate cost estimating model for river dredging construction. In: KSCE Journal of Civil Engineering, v. 15, n. 1 (December 2010). (2010):
- Risk importance and allocation in the Pakistan Construction Industry: A contractors' perspective. In: KSCE Journal of Civil Engineering, v. 11, n. 2 (March 2007). (2007):
- Critical review of previous studies on labor productivity loss due to overtime. In: KSCE Journal of Civil Engineering, v. 21, n. 7 (May 2017). (2017):
- Representations for imagining the scene of non-existing buildings in an existing environment. In: Automation in Construction, v. 33 (August 2013). (2013):
- Prediction of WSN placement for bridge health monitoring based on material characteristics. In: Automation in Construction, v. 35 (November 2013). (2013):