- Analysis of the Impact of Government-Supplied Material Purchase Contracts with On-site Installation on Construction Market. Dans: KSCE Journal of Civil Engineering, v. 27, n. 12 (octobre 2023). (2023):
- Determination of optimal accelerometer locations using modal sensitivity for identifying a structure. Dans: Smart Structures and Systems, v. 4, n. 5 (septembre 2008). (2008):
- Enhancing Education of Construction Materials Course Using Guided Inquiry Modules Instruction. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 139, n. 1 (janvier 2013). (2013):
- Study of Satisfaction Levels on Construction Engineering Education in Cyber University and Its Improvements. Dans: KSCE Journal of Civil Engineering, v. 23, n. 2 (janvier 2019). (2019):
- Comparison of Efficiency and Satisfaction Level on Different Construction Management Methods for Public Construction Projects in Korea. Dans: KSCE Journal of Civil Engineering, v. 23, n. 6 (mai 2019). (2019):
- Logistic Regression Modeling to Determine Projects impacted by Schedule Compression. Dans: KSCE Journal of Civil Engineering, v. 23, n. 4 (mars 2019). (2019):
- Identification of IT application areas and potential solutions for perception enhancement to improve construction safety. Dans: KSCE Journal of Civil Engineering, v. 18, n. 2 (janvier 2014). (2014):
- Simulation technique-based sensitivity analysis on staircase construction process in high-rise building construction. Dans: KSCE Journal of Civil Engineering, v. 18, n. 2 (janvier 2014). (2014):
- Study on the issues of the lowest bidding through the analysis of working budget ratio of Korean construction companies. Dans: KSCE Journal of Civil Engineering, v. 21, n. 5 (août 2016). (2016):
- Development of budget-constrained rescheduling method in mega construction project. Dans: KSCE Journal of Civil Engineering, v. 21, n. 1 (mai 2016). (2016):
- Approximate cost estimating model for river facility construction based on case-based reasoning with genetic algorithms. Dans: KSCE Journal of Civil Engineering, v. 16, n. 3 (février 2012). (2012):
- Simulation analysis of labor performance during overtime and impact on project duration. Dans: KSCE Journal of Civil Engineering, v. 20, n. 7 (janvier 2016). (2016):
- Identification of applications of mobile devices to improve airport BHS maintenance. Dans: KSCE Journal of Civil Engineering, v. 18, n. 5 (mai 2014). (2014):
- Approximate cost estimating model of eco-type trade for river facility construction using case-based reasoning and genetic algorithms. Dans: KSCE Journal of Civil Engineering, v. 17, n. 2 (mars 2013). (2013):
- Flexible Work Breakdown Structure for Integrated Cost and Schedule Control. Dans: Journal of Construction Engineering and Management, v. 130, n. 5 (octobre 2004). (2004):
- Framework of the approximate cost estimating model for river dredging construction. Dans: KSCE Journal of Civil Engineering, v. 15, n. 1 (décembre 2010). (2010):
- Risk importance and allocation in the Pakistan Construction Industry: A contractors' perspective. Dans: KSCE Journal of Civil Engineering, v. 11, n. 2 (mars 2007). (2007):
- Critical review of previous studies on labor productivity loss due to overtime. Dans: KSCE Journal of Civil Engineering, v. 21, n. 7 (mai 2017). (2017):
- Representations for imagining the scene of non-existing buildings in an existing environment. Dans: Automation in Construction, v. 33 (août 2013). (2013):
- Prediction of WSN placement for bridge health monitoring based on material characteristics. Dans: Automation in Construction, v. 35 (novembre 2013). (2013):