Approximate cost estimating model of eco-type trade for river facility construction using case-based reasoning and genetic algorithms
Auteur(s): |
Siwook Lee
Youngmin Jin Sungkwon Woo Do Hyoung Shin |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | KSCE Journal of Civil Engineering, mars 2013, n. 2, v. 17 |
Page(s): | 292-300 |
DOI: | 10.1007/s12205-013-1638-5 |
- Informations
sur cette fiche - Reference-ID
10171721 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018