Siwook Lee
- Analysis of the Impact of Government-Supplied Material Purchase Contracts with On-site Installation on Construction Market. Dans: KSCE Journal of Civil Engineering, v. 27, n. 12 (octobre 2023). (2023):
- Comparison of Efficiency and Satisfaction Level on Different Construction Management Methods for Public Construction Projects in Korea. Dans: KSCE Journal of Civil Engineering, v. 23, n. 6 (mai 2019). (2019):
- Identification of IT application areas and potential solutions for perception enhancement to improve construction safety. Dans: KSCE Journal of Civil Engineering, v. 18, n. 2 (janvier 2014). (2014):
- Study on the issues of the lowest bidding through the analysis of working budget ratio of Korean construction companies. Dans: KSCE Journal of Civil Engineering, v. 21, n. 5 (août 2016). (2016):
- Development of budget-constrained rescheduling method in mega construction project. Dans: KSCE Journal of Civil Engineering, v. 21, n. 1 (mai 2016). (2016):
- Approximate cost estimating model for river facility construction based on case-based reasoning with genetic algorithms. Dans: KSCE Journal of Civil Engineering, v. 16, n. 3 (février 2012). (2012):
- Identification of applications of mobile devices to improve airport BHS maintenance. Dans: KSCE Journal of Civil Engineering, v. 18, n. 5 (mai 2014). (2014):
- Approximate cost estimating model of eco-type trade for river facility construction using case-based reasoning and genetic algorithms. Dans: KSCE Journal of Civil Engineering, v. 17, n. 2 (mars 2013). (2013):
- Framework of the approximate cost estimating model for river dredging construction. Dans: KSCE Journal of Civil Engineering, v. 15, n. 1 (décembre 2010). (2010):