Flexible Work Breakdown Structure for Integrated Cost and Schedule Control
Author(s): |
Youngsoo Jung
Sungkwon Woo |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, October 2004, n. 5, v. 130 |
Page(s): | 616-625 |
DOI: | 10.1061/(asce)0733-9364(2004)130:5(616) |
- About this
data sheet - Reference-ID
10160437 - Published on:
11/12/2018 - Last updated on:
11/12/2018