-
Shi, Qingyi / Wang, Zhaohui / Zheng, Zecheng / Zhou, Ziyang / Wang, Zhongren / Guo, Yufei / Wu, Pengmin (2024): Trajectory tracking control of a wall-building robot in an uncertain viscoelastic environment. In: Automation in Construction, v. 166 (October 2024).
https://doi.org/10.1016/j.autcon.2024.105611
-
Shi, Qingyi / Wang, Zhaohui / Ke, Xilin / Zheng, Zecheng / Zhou, Ziyang / Wang, Zhongren / Fan, Yiwei / Lei, Bin / Wu, Pengmin (2023): Trajectory optimization of wall-building robots using response surface and non-dominated sorting genetic algorithm III. In: Automation in Construction, v. 155 (November 2023).
https://doi.org/10.1016/j.autcon.2023.105035
-
Zhang, Kun / Wang, Zhongren (2023): LTPP data-based investigation on asphalt pavement performance using geospatial hot spot analysis and decision tree models. In: International Journal of Transportation Science and Technology, v. 12, n. 2 (June 2023).
https://doi.org/10.1016/j.ijtst.2022.06.007
-
Shu, Xiang / Wang, Zhongren / Basheer, Imad A. (2022): Large-scale evaluation of pavement performance models utilizing automated pavement condition survey data. In: International Journal of Transportation Science and Technology, v. 11, n. 4 (December 2022).
https://doi.org/10.1016/j.ijtst.2021.09.003
-
Wang, Zhongren / Zhou, Haiping / Mandapaka, Venkata / Nguyen, Lan (2021): Pavement maintenance and rehabilitation practices in California: A study of 35-year as-built data in PaveM. In: International Journal of Transportation Science and Technology, v. 10, n. 4 (December 2021).
https://doi.org/10.1016/j.ijtst.2021.04.005
-
Yang, Guangchuan / Xu, Hao / Tian, Zong / Wang, Zhongren (2016): Vehicle Speed and Acceleration Profile Study for Metered On-Ramps in California. In: Journal of Transportation Engineering, v. 142, n. 2 (February 2016).
https://doi.org/10.1061/(asce)te.1943-5436.0000817
-
Yang, Guangchuan / Tian, Zong / Wang, Zhongren / Xu, Hao / Yue, Rui (2019): Impact of On-Ramp Traffic Flow Arrival Profile on Queue Length at Metered On-Ramps. In: Journal of Transportation Engineering, Part A: Systems, v. 145, n. 2 (February 2019).
https://doi.org/10.1061/jtepbs.0000211
-
Yang, Guangchuan / Wang, Zhongren / Xu, Hao / Tian, Zong (2018): Feasibility of Using a Constant Acceleration Rate for Freeway Entrance Ramp Acceleration Lane Length Design. In: Journal of Transportation Engineering, Part A: Systems, v. 144, n. 3 (March 2018).
https://doi.org/10.1061/jtepbs.0000122
-
Wang, Zhongren / Pyle, Tom (2019): Implementing a pavement management system: The Caltrans experience. In: International Journal of Transportation Science and Technology, v. 8, n. 3 (September 2019).
https://doi.org/10.1016/j.ijtst.2019.02.002
-
Yu, Bin / Liu, Chiu / Wang, Zhongren (2014): Development of a Computer System for Simulation of Traffic Models. In: Journal of Computing in Civil Engineering, v. 28, n. 2 (March 2014).
https://doi.org/10.1061/(asce)cp.1943-5487.0000260
-
Wang, Zhongren / Dang, Vinh (2012): A Discussion on the Current MUTCD Standards on Traffic Control Signals for Freeway Entrance Ramps. In: International Journal of Transportation Science and Technology, v. 1, n. 1 (March 2012).
https://doi.org/10.1260/2046-0430.1.1.73
-
Liu, Chiu / Wang, Zhongren (2012): Determination of Onramp Weaving Length for Resolving Merging Dilemma. In: International Journal of Transportation Science and Technology, v. 1, n. 1 (March 2012).
https://doi.org/10.1260/2046-0430.1.1.49
-
Wang, Zhongren (2012): A Comparison of Floating Car vs. Loop Detector Estimated Freeway Travel Time Delay. In: International Journal of Transportation Science and Technology, v. 1, n. 2 (June 2012).
https://doi.org/10.1260/2046-0430.1.2.147
-
Liu, Chiu / Wang, Zhongren (2012): Determination of Sight Distance on a Combined Crest and Circular Curve in a Three Dimensional Space. In: International Journal of Transportation Science and Technology, v. 1, n. 2 (June 2012).
https://doi.org/10.1260/2046-0430.1.2.219
-
Liu, Chiu / Wang, Zhongren (2012): Deriving Sight Distance on a Compound Sag and Circular Curve in a Three Dimensional Space. In: International Journal of Transportation Science and Technology, v. 1, n. 3 (September 2012).
https://doi.org/10.1260/2046-0430.1.3.297
-
Liu, Chiu / Wang, Zhongren (2013): Estimate Freeway Exit Sign Locations. In: International Journal of Transportation Science and Technology, v. 2, n. 1 (March 2013).
https://doi.org/10.1260/2046-0430.2.1.79
-
Wang, Zhongren (2013): Queue Storage Design for Metered On-Ramps. In: International Journal of Transportation Science and Technology, v. 2, n. 1 (March 2013).
https://doi.org/10.1260/2046-0430.2.1.47
-
Wang, Zhongren (2013): The Sight Distance Issues with Retrofitted Single-Lane HOV Facilities. In: International Journal of Transportation Science and Technology, v. 2, n. 2 (June 2013).
https://doi.org/10.1260/2046-0430.2.2.149
-
Liu, Chiu / Wang, Zhongren (2013): Ramp Metering Influence on Freeway Operational Safety near On-ramp Exits. In: International Journal of Transportation Science and Technology, v. 2, n. 2 (June 2013).
https://doi.org/10.1260/2046-0430.2.2.87
-
Liu, Chiu / Wang, Zhongren (2013): The Weaving Length Limit for Short Free Onramps. In: International Journal of Transportation Science and Technology, v. 2, n. 3 (September 2013).
https://doi.org/10.1260/2046-0430.2.3.261
-
Liu, Chiu / Wang, Zhongren (2013): Integrating Visibility, Parking Restriction, and Driver's Field View for Enhancing Pedestrian Crossing Safety. In: International Journal of Transportation Science and Technology, v. 2, n. 4 (December 2013).
https://doi.org/10.1260/2046-0430.2.4.351
-
Wang, Zhongren (2013): Ramp Metering Status in California. In: International Journal of Transportation Science and Technology, v. 2, n. 4 (December 2013).
https://doi.org/10.1260/2046-0430.2.4.337
-
Su, Dongyan / Lu, Xiao-Yun / Horowitz, Roberto / Wang, Zhongren (2014): Coordinated Ramp Metering and Intersection Signal Control. In: International Journal of Transportation Science and Technology, v. 3, n. 2 (June 2014).
https://doi.org/10.1260/2046-0430.3.2.179
-
Wang, Zhongren / Nguyen, Hiep (2014): An Evaluation of Ramp Control Signal Head Placement Based on Motorist's Cone of Visions. In: International Journal of Transportation Science and Technology, v. 3, n. 3 (September 2014).
https://doi.org/10.1260/2046-0430.3.3.265
-
Wang, Zhongren / Liu, Chiu (2014): The Minimum Yellow Timing for Ramp Meters. In: International Journal of Transportation Science and Technology, v. 3, n. 4 (December 2014).
https://doi.org/10.1260/2046-0430.3.4.365
-
Wang, Zhongren / Nguyen, Hiep / Liu, Chiu (2015): Placement Design of Changeable Message Signs on Curved Roadways. In: International Journal of Transportation Science and Technology, v. 4, n. 4 (December 2015).
https://doi.org/10.1016/s2046-0430(16)30172-1
-
Yang, Guangchuan / Xu, Hao / Wang, Zhongren / Tian, Zong (2016): Truck acceleration behavior study and acceleration lane length recommendations for metered on-ramps. In: International Journal of Transportation Science and Technology, v. 5, n. 2 (October 2016).
https://doi.org/10.1016/j.ijtst.2016.09.006
-
Chen, Chen / Liu, Chiu / Wang, Zhongren (2008): New approach to determine number of lanes on freeway upgrades. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 10 (October 2008).
https://doi.org/10.1139/l08-048