Thomas K. L. Tong

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Tam, C. M. / Tong, Thomas K. L. / Tse, Sharon L. (2002): Artificial neural networks model for predicting excavator productivity. In: Engineering, Construction and Architectural Management, v. 9, n. 1 (January 2002).

    https://doi.org/10.1108/eb021238

  2. Tong, Thomas K. L. / Tam, C. M. (2003): Fuzzy optimisation of labour allocation by genetic algorithms. In: Engineering, Construction and Architectural Management, v. 10, n. 2 (April 2003).

    https://doi.org/10.1108/09699980310466613

  3. Tam, C. M. / Tong, Thomas K. L. (2011): Conflict analysis study for public engagement programme in infrastructure planning. In: Built Environment Project and Asset Management, v. 1, n. 1 (July 2011).

    https://doi.org/10.1108/20441241111143777

  4. Tam, Chi‐Ming / Tong, Thomas K. L. (2008): Locating large‐scale harbour‐front project developments using SIR method with grey aggregation approach. In: Construction Innovation, v. 8, n. 2 (April 2008).

    https://doi.org/10.1108/14714170810867041

  5. Tam, C. M. / Tong, Thomas K. L. (2005): Multiple GMDH models for estimating resource requirements. In: Construction Innovation, v. 5, n. 2 (June 2005).

    https://doi.org/10.1108/14714170510815212

  6. Tam, C. M. / Tong, Thomas K. L. / Lau, C. T. (2003): ELECTRE III in evaluating performance of construction plants: case study on concrete vibrators. In: Construction Innovation, v. 3, n. 1 (March 2003).

    https://doi.org/10.1108/14714170310814846

  7. Tam, C. M. / Tong, Thomas K. L. / Chan, Wilson K. W. (2001): Genetic Algorithm for Optimizing Supply Locations around Tower Crane. In: Journal of Construction Engineering and Management, v. 127, n. 4 (August 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:4(315)

  8. Tam, C. M. / Tong, Thomas K. L. / Leung, Arthur W. T. / Chiu, Gerald W. C. (2002): Site Layout Planning using Nonstructural Fuzzy Decision Support System. In: Journal of Construction Engineering and Management, v. 128, n. 3 (June 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:3(220)

  9. Tam, C. M. / Tong, Thomas K. L. / Wong, Y. W. (2004): Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method. In: Journal of Construction Engineering and Management, v. 130, n. 6 (December 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:6(827)

  10. Tam, C. M. / Tong, Thomas K. L. / Lau, Tony C. T. / Chan, K. K. (2004): Diagnosis of prestressed concrete pile defects using probabilistic neural networks. In: Engineering Structures, v. 26, n. 8 (July 2004).

    https://doi.org/10.1016/j.engstruct.2004.03.018

  11. Tam, Chi Ming / Tong, Thomas K. L. / Wong, Bill W. L. (2007): An integrated system for earthmoving planning. In: Construction Management and Economics, v. 25, n. 11 (November 2007).

    https://doi.org/10.1080/01446190701468836

  12. Tam, Chi Mint / Tong, Thomas K. L. / Chan, K. K. (2006): Rough set theory for distilling construction safety measures. In: Construction Management and Economics, v. 24, n. 11 (November 2006).

    https://doi.org/10.1080/01446190600879091

  13. Tong, Thomas K. L. / Tam, C. M. / Chan, Albert P. C. (2001): Genetic algorithm optimization in building portfolio management. In: Construction Management and Economics, v. 19, n. 6 (October 2001).

    https://doi.org/10.1080/01446190110062096

  14. Tam, C. M. / Tong, Thomas K. L. (2003): GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction. In: Construction Management and Economics, v. 21, n. 3 (April 2003).

    https://doi.org/10.1080/0144619032000049665

  15. Tam, C. M. / Tong, Thomas K. L. / Lau, Tony C. T. / Chan, K. K. (2005): Selection of vertical formwork system by probabilistic neural networks models. In: Construction Management and Economics, v. 23, n. 3 (March 2005).

    https://doi.org/10.1080/0144619042000205912

  16. Tam, C. M. / Tong, Thomas K. L. / Cheung, S. O. / Chan, Albert P. C. (2001): Genetic algorithm model in optimizing the use of labour. In: Construction Management and Economics, v. 19, n. 2 (March 2001).

    https://doi.org/10.1080/01446190150505126

  17. Tam, C. M. / Tong, Thomas K. L. / Tse, Sharon L. (2004): Modelling hook times of mobile cranes using artificial neural networks. In: Construction Management and Economics, v. 22, n. 8 (October 2004).

    https://doi.org/10.1080/0144619042000202771

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine