Thomas K. L. Tong
- Artificial neural networks model for predicting excavator productivity. Dans: Engineering, Construction and Architectural Management, v. 9, n. 1 (janvier 2002). (2002):
- Fuzzy optimisation of labour allocation by genetic algorithms. Dans: Engineering, Construction and Architectural Management, v. 10, n. 2 (avril 2003). (2003):
- Conflict analysis study for public engagement programme in infrastructure planning. Dans: Built Environment Project and Asset Management, v. 1, n. 1 (juillet 2011). (2011):
- Locating large‐scale harbour‐front project developments using SIR method with grey aggregation approach. Dans: Construction Innovation, v. 8, n. 2 (avril 2008). (2008):
- Multiple GMDH models for estimating resource requirements. Dans: Construction Innovation, v. 5, n. 2 (juin 2005). (2005):
- ELECTRE III in evaluating performance of construction plants: case study on concrete vibrators. Dans: Construction Innovation, v. 3, n. 1 (mars 2003). (2003):
- Genetic Algorithm for Optimizing Supply Locations around Tower Crane. Dans: Journal of Construction Engineering and Management, v. 127, n. 4 (août 2001). (2001):
- Site Layout Planning using Nonstructural Fuzzy Decision Support System. Dans: Journal of Construction Engineering and Management, v. 128, n. 3 (juin 2002). (2002):
- Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method. Dans: Journal of Construction Engineering and Management, v. 130, n. 6 (décembre 2004). (2004):
- Diagnosis of prestressed concrete pile defects using probabilistic neural networks. Dans: Engineering Structures, v. 26, n. 8 (juillet 2004). (2004):
- An integrated system for earthmoving planning. Dans: Construction Management and Economics, v. 25, n. 11 (novembre 2007). (2007):
- Rough set theory for distilling construction safety measures. Dans: Construction Management and Economics, v. 24, n. 11 (novembre 2006). (2006):
- Genetic algorithm optimization in building portfolio management. Dans: Construction Management and Economics, v. 19, n. 6 (octobre 2001). (2001):
- GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction. Dans: Construction Management and Economics, v. 21, n. 3 (avril 2003). (2003):
- Selection of vertical formwork system by probabilistic neural networks models. Dans: Construction Management and Economics, v. 23, n. 3 (mars 2005). (2005):
- Genetic algorithm model in optimizing the use of labour. Dans: Construction Management and Economics, v. 19, n. 2 (mars 2001). (2001):
- Modelling hook times of mobile cranes using artificial neural networks. Dans: Construction Management and Economics, v. 22, n. 8 (octobre 2004). (2004):