Thomas K. L. Tong
- Artificial neural networks model for predicting excavator productivity. In: Engineering, Construction and Architectural Management, v. 9, n. 1 (Januar 2002). (2002):
- Fuzzy optimisation of labour allocation by genetic algorithms. In: Engineering, Construction and Architectural Management, v. 10, n. 2 (April 2003). (2003):
- Conflict analysis study for public engagement programme in infrastructure planning. In: Built Environment Project and Asset Management, v. 1, n. 1 (Juli 2011). (2011):
- Locating large‐scale harbour‐front project developments using SIR method with grey aggregation approach. In: Construction Innovation, v. 8, n. 2 (April 2008). (2008):
- Multiple GMDH models for estimating resource requirements. In: Construction Innovation, v. 5, n. 2 (Juni 2005). (2005):
- ELECTRE III in evaluating performance of construction plants: case study on concrete vibrators. In: Construction Innovation, v. 3, n. 1 (März 2003). (2003):
- Genetic Algorithm for Optimizing Supply Locations around Tower Crane. In: Journal of Construction Engineering and Management, v. 127, n. 4 (August 2001). (2001):
- Site Layout Planning using Nonstructural Fuzzy Decision Support System. In: Journal of Construction Engineering and Management, v. 128, n. 3 (Juni 2002). (2002):
- Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method. In: Journal of Construction Engineering and Management, v. 130, n. 6 (Dezember 2004). (2004):
- Diagnosis of prestressed concrete pile defects using probabilistic neural networks. In: Engineering Structures, v. 26, n. 8 (Juli 2004). (2004):
- An integrated system for earthmoving planning. In: Construction Management and Economics, v. 25, n. 11 (November 2007). (2007):
- Rough set theory for distilling construction safety measures. In: Construction Management and Economics, v. 24, n. 11 (November 2006). (2006):
- Genetic algorithm optimization in building portfolio management. In: Construction Management and Economics, v. 19, n. 6 (Oktober 2001). (2001):
- GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction. In: Construction Management and Economics, v. 21, n. 3 (April 2003). (2003):
- Selection of vertical formwork system by probabilistic neural networks models. In: Construction Management and Economics, v. 23, n. 3 (März 2005). (2005):
- Genetic algorithm model in optimizing the use of labour. In: Construction Management and Economics, v. 19, n. 2 (März 2001). (2001):
- Modelling hook times of mobile cranes using artificial neural networks. In: Construction Management and Economics, v. 22, n. 8 (Oktober 2004). (2004):