Seyed Mohsen Shahandashti
- Empirical tests for identifying leading indicators of ENR Construction Cost Index. In: Construction Management and Economics, v. 30, n. 11 (November 2012). (2012):
- Data-Fusion Approaches and Applications for Construction Engineering. In: Journal of Construction Engineering and Management, v. 137, n. 10 (October 2011). (2011):
- Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints. In: Automation in Construction, v. 18, n. 4 (July 2009). (2009):
- Sensing and Field Data Capture for Construction and Facility Operations. In: Journal of Construction Engineering and Management, v. 137, n. 10 (October 2011). (2011):