Seyed Mohsen Shahandashti
- Empirical tests for identifying leading indicators of ENR Construction Cost Index. Dans: Construction Management and Economics, v. 30, n. 11 (novembre 2012). (2012):
- Data-Fusion Approaches and Applications for Construction Engineering. Dans: Journal of Construction Engineering and Management, v. 137, n. 10 (octobre 2011). (2011):
- Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints. Dans: Automation in Construction, v. 18, n. 4 (juillet 2009). (2009):
- Sensing and Field Data Capture for Construction and Facility Operations. Dans: Journal of Construction Engineering and Management, v. 137, n. 10 (octobre 2011). (2011):