Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
Author(s): |
Po-Han Chen
Seyed Mohsen Shahandashti |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, July 2009, n. 4, v. 18 |
Page(s): | 434-443 |
DOI: | 10.1016/j.autcon.2008.10.007 |
- About this
data sheet - Reference-ID
10189824 - Published on:
10/12/2018 - Last updated on:
10/12/2018