Mieczysław Połoński ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Połoński, Mieczysław (2014): Construction project budgeting including time buffers and costs. In: Budownictwo i Architektura, v. 13, n. 4 (December 2014).

    https://doi.org/10.35784/bud-arch.1873

  2. Połoński, Mieczysław (2013): Scheduling of building projects taking into account the time buffers determined on the basis of risk analysis. In: Budownictwo i Architektura, v. 12, n. 1 (March 2013).

    https://doi.org/10.35784/bud-arch.2164

  3. Ziółkowska, Aneta / Połoński, Mieczysław (2016): Application of the EVM Method and Ist Extensions in the Implementation of Construction Objects. In: Engineering Structures and Technologies, v. 7, n. 4 (April 2016).

    https://doi.org/10.3846/2029882x.2016.1152168

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine