Application of the EVM Method and Ist Extensions in the Implementation of Construction Objects

Author(s):

Medium: journal article
Language(s): English
Published in: Engineering Structures and Technologies, , n. 4, v. 7
Page(s): 189-196
DOI: 10.3846/2029882x.2016.1152168
Abstract:

Surpassing of the planned budget and delivery time is a common feature during the implementation of building investments in Poland. Only a small number of companies use effective methods of project monitoring during investment performance. One of the popular tools used to control projects with regard to cost and time is the earned value method (EVM). There is, however, no detailed guidance how to deploy the method to the specific characteristics and conditions during the execution of building investments. This fact has contributed to this paper, which presents the results of application and adaptation of the earned value method (EVM) and its further extensions in the control of building projects during their execution (with regard to cost and time), prediction of the final duration and costs, and presentation of the effects resulting from calculations. The analyses were performed in terms of the contractor for 5 selected completed and ongoing building projects in Poland.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3846/2029882x.2016.1152168.
  • About this
    data sheet
  • Reference-ID
    10325974
  • Published on:
    21/07/2019
  • Last updated on:
    21/07/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine