- Construction project budgeting including time buffers and costs. In: Budownictwo i Architektura, v. 13, n. 4 (Dezember 2014). (2014):
- Scheduling of building projects taking into account the time buffers determined on the basis of risk analysis. In: Budownictwo i Architektura, v. 12, n. 1 (März 2013). (2013):
- Application of the EVM Method and Ist Extensions in the Implementation of Construction Objects. In: Engineering Structures and Technologies, v. 7, n. 4 (April 2016). (2016):