0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Garold D. Oberlender

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Alroomi, Anwar / David Jeong, H. / Oberlender, Garold D. (2016): Evaluation of Methods to Retain Cost Estimating Competencies Using Structural Equation Modeling. In: Journal of Management in Engineering (ASCE), v. 32, n. 1 (January 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000380

  2. Oberlender, Garold D. (1984): Development of Construction Research. In: Journal of Construction Engineering and Management, v. 110, n. 4 (December 1984).

    https://doi.org/10.1061/(asce)0733-9364(1984)110:4(486)

  3. Oberlender, Garold D. / Hughes, Robert K. (1987): Graduate Construction Programs in the United States. In: Journal of Construction Engineering and Management, v. 113, n. 1 (March 1987).

    https://doi.org/10.1061/(asce)0733-9364(1987)113:1(17)

  4. Oberlender, Garold D. / Trost, Steven M. (2001): Predicting Accuracy of Early Cost Estimates Based on Estimate Quality. In: Journal of Construction Engineering and Management, v. 127, n. 3 (June 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:3(173)

  5. Woldesenbet, Asregedew / Jeong, "David" Hyung Seok / Oberlender, Garold D. (2012): Daily Work Reports–Based Production Rate Estimation for Highway Projects. In: Journal of Construction Engineering and Management, v. 138, n. 4 (April 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000442

  6. Duffy, Gregory A. / Oberlender, Garold D. / Jeong, David Hyung Seok (2011): Linear Scheduling Model with Varying Production Rates. In: Journal of Construction Engineering and Management, v. 137, n. 8 (August 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000320

  7. Jeong, Hyung Seok / Atreya, Siddharth / Oberlender, Garold D. / Chung, BooYoung (2009): Automated contract time determination system for highway projects. In: Automation in Construction, v. 18, n. 7 (November 2009).

    https://doi.org/10.1016/j.autcon.2009.04.004

  8. Duffy, Greg / Woldesenbet, Asregedew / Jeong, "David" Hyung Seok / Oberlender, Garold D. (2012): Advanced linear scheduling program with varying production rates for pipeline construction projects. In: Automation in Construction, v. 27 (November 2012).

    https://doi.org/10.1016/j.autcon.2012.05.014

  9. Alroomi, Anwar / Jeong, David Hyung Seok / Oberlender, Garold D. (2012): Analysis of Cost-Estimating Competencies Using Criticality Matrix and Factor Analysis. In: Journal of Construction Engineering and Management, v. 138, n. 11 (November 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000351

  10. Oberlender, Garold D. (1996): Small Businesses Fuel Economic Growth, Innovation, and Job Creation. In: Practice Periodical on Structural Design and Construction, v. 1, n. 3 (August 1996).

    https://doi.org/10.1061/(asce)1084-0680(1996)1:3(76)

  11. Trost, Steven M. / Oberlender, Garold D. (2003): Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression. In: Journal of Construction Engineering and Management, v. 129, n. 2 (March - April 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:2(198)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine