0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Garold D. Oberlender

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Alroomi, Anwar / David Jeong, H. / Oberlender, Garold D. (2016): Evaluation of Methods to Retain Cost Estimating Competencies Using Structural Equation Modeling. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 1 (janvier 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000380

  2. Oberlender, Garold D. (1984): Development of Construction Research. Dans: Journal of Construction Engineering and Management, v. 110, n. 4 (décembre 1984).

    https://doi.org/10.1061/(asce)0733-9364(1984)110:4(486)

  3. Oberlender, Garold D. / Hughes, Robert K. (1987): Graduate Construction Programs in the United States. Dans: Journal of Construction Engineering and Management, v. 113, n. 1 (mars 1987).

    https://doi.org/10.1061/(asce)0733-9364(1987)113:1(17)

  4. Oberlender, Garold D. / Trost, Steven M. (2001): Predicting Accuracy of Early Cost Estimates Based on Estimate Quality. Dans: Journal of Construction Engineering and Management, v. 127, n. 3 (juin 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:3(173)

  5. Woldesenbet, Asregedew / Jeong, "David" Hyung Seok / Oberlender, Garold D. (2012): Daily Work Reports–Based Production Rate Estimation for Highway Projects. Dans: Journal of Construction Engineering and Management, v. 138, n. 4 (avril 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000442

  6. Duffy, Gregory A. / Oberlender, Garold D. / Jeong, David Hyung Seok (2011): Linear Scheduling Model with Varying Production Rates. Dans: Journal of Construction Engineering and Management, v. 137, n. 8 (août 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000320

  7. Jeong, Hyung Seok / Atreya, Siddharth / Oberlender, Garold D. / Chung, BooYoung (2009): Automated contract time determination system for highway projects. Dans: Automation in Construction, v. 18, n. 7 (novembre 2009).

    https://doi.org/10.1016/j.autcon.2009.04.004

  8. Duffy, Greg / Woldesenbet, Asregedew / Jeong, "David" Hyung Seok / Oberlender, Garold D. (2012): Advanced linear scheduling program with varying production rates for pipeline construction projects. Dans: Automation in Construction, v. 27 (novembre 2012).

    https://doi.org/10.1016/j.autcon.2012.05.014

  9. Alroomi, Anwar / Jeong, David Hyung Seok / Oberlender, Garold D. (2012): Analysis of Cost-Estimating Competencies Using Criticality Matrix and Factor Analysis. Dans: Journal of Construction Engineering and Management, v. 138, n. 11 (novembre 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000351

  10. Oberlender, Garold D. (1996): Small Businesses Fuel Economic Growth, Innovation, and Job Creation. Dans: Practice Periodical on Structural Design and Construction, v. 1, n. 3 (août 1996).

    https://doi.org/10.1061/(asce)1084-0680(1996)1:3(76)

  11. Trost, Steven M. / Oberlender, Garold D. (2003): Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression. Dans: Journal of Construction Engineering and Management, v. 129, n. 2 (mars - avril 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:2(198)

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine