Garold D. Oberlender
- Evaluation of Methods to Retain Cost Estimating Competencies Using Structural Equation Modeling. In: Journal of Management in Engineering (ASCE), v. 32, n. 1 (Januar 2016). (2016):
- Development of Construction Research. In: Journal of Construction Engineering and Management, v. 110, n. 4 (Dezember 1984). (1984):
- Graduate Construction Programs in the United States. In: Journal of Construction Engineering and Management, v. 113, n. 1 (März 1987). (1987):
- Predicting Accuracy of Early Cost Estimates Based on Estimate Quality. In: Journal of Construction Engineering and Management, v. 127, n. 3 (Juni 2001). (2001):
- Daily Work Reports–Based Production Rate Estimation for Highway Projects. In: Journal of Construction Engineering and Management, v. 138, n. 4 (April 2012). (2012):
- Linear Scheduling Model with Varying Production Rates. In: Journal of Construction Engineering and Management, v. 137, n. 8 (August 2011). (2011):
- Automated contract time determination system for highway projects. In: Automation in Construction, v. 18, n. 7 (November 2009). (2009):
- Advanced linear scheduling program with varying production rates for pipeline construction projects. In: Automation in Construction, v. 27 (November 2012). (2012):
- Analysis of Cost-Estimating Competencies Using Criticality Matrix and Factor Analysis. In: Journal of Construction Engineering and Management, v. 138, n. 11 (November 2012). (2012):
- Small Businesses Fuel Economic Growth, Innovation, and Job Creation. In: Practice Periodical on Structural Design and Construction, v. 1, n. 3 (August 1996). (1996):
- Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression. In: Journal of Construction Engineering and Management, v. 129, n. 2 (März - April 2003). (2003):