James T. O'Connor

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. O'Connor, James T. / Leite, Fernanda / Ma, Jong Won (2022): Expanding advanced work packaging to include commissioning and startup for industrial projects. In: Construction Innovation, v. 23, n. 5 (August 2022).

    https://doi.org/10.1108/ci-09-2021-0173

  2. O'Connor, James T. / Norwich, W. T. (1993): Fossil Power Plant Constructability: Applications of CII Concepts. In: Journal of Energy Engineering, v. 119, n. 1 (April 1993).

    https://doi.org/10.1061/(asce)0733-9402(1993)119:1(55)

  3. Koo, Hyun Jeong / O'Connor, James T. (2021): Complexity Analysis of Design Deliverable Defects on Building Projects. In: Journal of Management in Engineering (ASCE), v. 37, n. 3 (May 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000897

  4. Woo, Jeyoung / O'Connor, James T. (2021): Causal Factors for Engineering Design Defects and Their Impacts. In: Practice Periodical on Structural Design and Construction, v. 26, n. 2 (May 2021).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000562

  5. O'Connor, James T. / Koo, Hyun Jeong (2020): Analyzing the Quality Problems and Defects of Design Deliverables on Building Projects. In: Journal of Architectural Engineering (ASCE), v. 26, n. 4 (December 2020).

    https://doi.org/10.1061/(asce)ae.1943-5568.0000432

  6. Mock, Brant / O'Connor, James T. (2019): High-value, low-effort industrial plant commissioning solution strategies. In: Construction Innovation, v. 19, n. 4 (October 2019).

    https://doi.org/10.1108/ci-09-2018-0072

  7. Caldas, Carlos H. / Elkington, Richard W. T. / O'Connor, James T. / Kim, Jung-Yeol (2015): Development of a Method to Retain Experiential Knowledge in Capital Projects Organizations. In: Journal of Management in Engineering (ASCE), v. 31, n. 5 (September 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000322

  8. Sohn, Taehong / Azambuja, Marcelo / O'Connor, James T. / O'Brien, William J. (2014): Empirical Study on the Key Drivers Affecting Durations for Right-of-Way Acquisition on Highway Projects. In: Journal of Management in Engineering (ASCE), v. 30, n. 3 (May 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000264

  9. Yang, Li-Ren / O'Connor, James T. / Huang, Chung-Fah (2007): Comparison of Technology Utilization and Benefits in Taiwanese and U.S. Industries. In: Journal of Management in Engineering (ASCE), v. 23, n. 3 (July 2007).

    https://doi.org/10.1061/(asce)0742-597x(2007)23:3(147)

  10. Cha, Hee Sung / O'Connor, James T. (2006): Characteristics for Leveraging Value Management Processes on Capital Facility Projects. In: Journal of Management in Engineering (ASCE), v. 22, n. 3 (July 2006).

    https://doi.org/10.1061/(asce)0742-597x(2006)22:3(135)

  11. Kallantzis, Alexandros C. / Borcherding, John D. / O'Connor, James T. (2007): Evaluation of Differing Subsurface Ground Conditions in Construction Contracts. In: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 1 (January 2007).

    https://doi.org/10.1061/(asce)1052-3928(2007)133:1(53)

  12. O'Connor, James T. / Mock, Brant D. (2019): Construction, Commissioning, and Startup Execution: Problematic Activities on Capital Projects. In: Journal of Construction Engineering and Management, v. 145, n. 4 (April 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001621

  13. Chong, Wai Kiong / Lee, Sang-Hoon / O'Connor, James T. (2011): Estimating Highway Construction Production Rates during Design: Elements of a Useful Estimation Tool. In: Leadership and Management in Engineering (ASCE), v. 11, n. 3 (July 2011).

    https://doi.org/10.1061/(asce)lm.1943-5630.0000135

  14. O'Connor, James T. / Larimore, Mark A. / Tucker, Richard L. (1986): Collecting Constructability Improvement Ideas. In: Journal of Construction Engineering and Management, v. 112, n. 4 (December 1986).

    https://doi.org/10.1061/(asce)0733-9364(1986)112:4(463)

  15. O'Connor, James T. / Rusch, Stephen E. / Schulz, Martin J. (1987): Constructability Concepts for Engineering and Procurement. In: Journal of Construction Engineering and Management, v. 113, n. 2 (June 1987).

    https://doi.org/10.1061/(asce)0733-9364(1987)113:2(235)

  16. O'Connor, James T. / Davis, Victoria S. (1988): Constructability Improvement During Field Operations. In: Journal of Construction Engineering and Management, v. 114, n. 4 (December 1988).

    https://doi.org/10.1061/(asce)0733-9364(1988)114:4(548)

  17. Fisher, Deborah J. / O'Connor, James T. (1991): Constructability for Piping Automation: Field Operations. In: Journal of Construction Engineering and Management, v. 117, n. 3 (September 1991).

    https://doi.org/10.1061/(asce)0733-9364(1991)117:3(468)

  18. O'Connor, James T. / Huh, Youngki (2006): Crew Production Rates for Contract Time Estimation: Beam Erection, Deck, and Rail of Highway Bridges. In: Journal of Construction Engineering and Management, v. 132, n. 4 (April 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:4(408)

  19. Jarrah, Ra'ed / Kulkarni, Devdatta / O'Connor, James T. (2007): Cash Flow Projections for Selected TxDoT Highway Projects. In: Journal of Construction Engineering and Management, v. 133, n. 3 (March 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:3(235)

  20. Varghese, Koshy / Dharwadkar, Parmanand / Wolfhope, John / O'Connor, James T. (1997): A Heavy Lift Planning System for Crane Lifts. In: Computer-Aided Civil and Infrastructure Engineering, v. 12, n. 1 (January 1997).

    https://doi.org/10.1111/0885-9507.00044

  21. Kang, Youngcheol / O'Brien, William J. / O'Connor, James T. (2012): Analysis of information integration benefit drivers and implementation hindrances. In: Automation in Construction, v. 22 (March 2012).

    https://doi.org/10.1016/j.autcon.2011.09.003

  22. Yang, Li-Ren / O'Connor, James T. / Chen, Jieh-Haur (2007): Assessment of automation and integration technology's impacts on project stakeholder success. In: Automation in Construction, v. 16, n. 6 (September 2007).

    https://doi.org/10.1016/j.autcon.2006.11.005

  23. O'Connor, James T. / Dodd, Steven C. (2000): Achieving integration on capital projects with enterprise resource planning systems. In: Automation in Construction, v. 9, n. 5-6 (September 2000).

    https://doi.org/10.1016/s0926-5805(00)00062-5

  24. O'Connor, James T. / O'Brien, William J. / Choi, Jin Ouk (2014): Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization. In: Journal of Construction Engineering and Management, v. 140, n. 6 (June 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000842

  25. O'Connor, James T. / Huh, Youngki (2005): Crew Production Rates for Contract Time Estimation: Bent Footing, Column, and Cap of Highway Bridges. In: Journal of Construction Engineering and Management, v. 131, n. 9 (September 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:9(1013)

  26. O'Connor, James T. / Miller, Steven J. (1994): Constructability Programs: Method for Assessment and Benchmarking. In: Journal of Performance of Constructed Facilities (ASCE), v. 8, n. 1 (February 1994).

    https://doi.org/10.1061/(asce)0887-3828(1994)8:1(46)

  27. O'Connor, James T. / Miller, Steven J. (1994): Barriers to Constructability Implementation. In: Journal of Performance of Constructed Facilities (ASCE), v. 8, n. 2 (May 1994).

    https://doi.org/10.1061/(asce)0887-3828(1994)8:2(110)

  28. O'Connor, James T. / Chmaytelli, Aref / Hugo, Fred (1993): Analysis of Highway Project Construction Claims. In: Journal of Performance of Constructed Facilities (ASCE), v. 7, n. 3 (August 1993).

    https://doi.org/10.1061/(asce)0887-3828(1993)7:3(170)

  29. O'Connor, James T. / Choi, Jin Ouk / Winkler, Matthew (2016): Critical Success Factors for Commissioning and Start-Up of Capital Projects. In: Journal of Construction Engineering and Management, v. 142, n. 11 (November 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001179

  30. Leandro, Roberto / O'Connor, James T. / Khwaja, Nabeel (2018): Development and Application of a Production-Rate Resource for Contract Time Determination. In: Journal of Construction Engineering and Management, v. 144, n. 12 (December 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001572

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine