-
O'Connor, James T. / Leite, Fernanda / Ma, Jong Won (2022): Expanding advanced work packaging to include commissioning and startup for industrial projects. In: Construction Innovation, v. 23, n. 5 (August 2022).
https://doi.org/10.1108/ci-09-2021-0173
-
O'Connor, James T. / Norwich, W. T. (1993): Fossil Power Plant Constructability: Applications of CII Concepts. In: Journal of Energy Engineering, v. 119, n. 1 (April 1993).
https://doi.org/10.1061/(asce)0733-9402(1993)119:1(55)
-
Koo, Hyun Jeong / O'Connor, James T. (2021): Complexity Analysis of Design Deliverable Defects on Building Projects. In: Journal of Management in Engineering (ASCE), v. 37, n. 3 (Mai 2021).
https://doi.org/10.1061/(asce)me.1943-5479.0000897
-
Woo, Jeyoung / O'Connor, James T. (2021): Causal Factors for Engineering Design Defects and Their Impacts. In: Practice Periodical on Structural Design and Construction, v. 26, n. 2 (Mai 2021).
https://doi.org/10.1061/(asce)sc.1943-5576.0000562
-
O'Connor, James T. / Koo, Hyun Jeong (2020): Analyzing the Quality Problems and Defects of Design Deliverables on Building Projects. In: Journal of Architectural Engineering (ASCE), v. 26, n. 4 (Dezember 2020).
https://doi.org/10.1061/(asce)ae.1943-5568.0000432
-
Mock, Brant / O'Connor, James T. (2019): High-value, low-effort industrial plant commissioning solution strategies. In: Construction Innovation, v. 19, n. 4 (Oktober 2019).
https://doi.org/10.1108/ci-09-2018-0072
-
Caldas, Carlos H. / Elkington, Richard W. T. / O'Connor, James T. / Kim, Jung-Yeol (2015): Development of a Method to Retain Experiential Knowledge in Capital Projects Organizations. In: Journal of Management in Engineering (ASCE), v. 31, n. 5 (September 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000322
-
Sohn, Taehong / Azambuja, Marcelo / O'Connor, James T. / O'Brien, William J. (2014): Empirical Study on the Key Drivers Affecting Durations for Right-of-Way Acquisition on Highway Projects. In: Journal of Management in Engineering (ASCE), v. 30, n. 3 (Mai 2014).
https://doi.org/10.1061/(asce)me.1943-5479.0000264
-
Yang, Li-Ren / O'Connor, James T. / Huang, Chung-Fah (2007): Comparison of Technology Utilization and Benefits in Taiwanese and U.S. Industries. In: Journal of Management in Engineering (ASCE), v. 23, n. 3 (Juli 2007).
https://doi.org/10.1061/(asce)0742-597x(2007)23:3(147)
-
Cha, Hee Sung / O'Connor, James T. (2006): Characteristics for Leveraging Value Management Processes on Capital Facility Projects. In: Journal of Management in Engineering (ASCE), v. 22, n. 3 (Juli 2006).
https://doi.org/10.1061/(asce)0742-597x(2006)22:3(135)
-
Kallantzis, Alexandros C. / Borcherding, John D. / O'Connor, James T. (2007): Evaluation of Differing Subsurface Ground Conditions in Construction Contracts. In: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 1 (Januar 2007).
https://doi.org/10.1061/(asce)1052-3928(2007)133:1(53)
-
O'Connor, James T. / Mock, Brant D. (2019): Construction, Commissioning, and Startup Execution: Problematic Activities on Capital Projects. In: Journal of Construction Engineering and Management, v. 145, n. 4 (April 2019).
https://doi.org/10.1061/(asce)co.1943-7862.0001621
-
Chong, Wai Kiong / Lee, Sang-Hoon / O'Connor, James T. (2011): Estimating Highway Construction Production Rates during Design: Elements of a Useful Estimation Tool. In: Leadership and Management in Engineering (ASCE), v. 11, n. 3 (Juli 2011).
https://doi.org/10.1061/(asce)lm.1943-5630.0000135
-
O'Connor, James T. / Larimore, Mark A. / Tucker, Richard L. (1986): Collecting Constructability Improvement Ideas. In: Journal of Construction Engineering and Management, v. 112, n. 4 (Dezember 1986).
https://doi.org/10.1061/(asce)0733-9364(1986)112:4(463)
-
O'Connor, James T. / Rusch, Stephen E. / Schulz, Martin J. (1987): Constructability Concepts for Engineering and Procurement. In: Journal of Construction Engineering and Management, v. 113, n. 2 (Juni 1987).
https://doi.org/10.1061/(asce)0733-9364(1987)113:2(235)
-
O'Connor, James T. / Davis, Victoria S. (1988): Constructability Improvement During Field Operations. In: Journal of Construction Engineering and Management, v. 114, n. 4 (Dezember 1988).
https://doi.org/10.1061/(asce)0733-9364(1988)114:4(548)
-
Fisher, Deborah J. / O'Connor, James T. (1991): Constructability for Piping Automation: Field Operations. In: Journal of Construction Engineering and Management, v. 117, n. 3 (September 1991).
https://doi.org/10.1061/(asce)0733-9364(1991)117:3(468)
-
O'Connor, James T. / Huh, Youngki (2006): Crew Production Rates for Contract Time Estimation: Beam Erection, Deck, and Rail of Highway Bridges. In: Journal of Construction Engineering and Management, v. 132, n. 4 (April 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:4(408)
-
Jarrah, Ra'ed / Kulkarni, Devdatta / O'Connor, James T. (2007): Cash Flow Projections for Selected TxDoT Highway Projects. In: Journal of Construction Engineering and Management, v. 133, n. 3 (März 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:3(235)
-
Varghese, Koshy / Dharwadkar, Parmanand / Wolfhope, John / O'Connor, James T. (1997): A Heavy Lift Planning System for Crane Lifts. In: Computer-Aided Civil and Infrastructure Engineering, v. 12, n. 1 (Januar 1997).
https://doi.org/10.1111/0885-9507.00044
-
Kang, Youngcheol / O'Brien, William J. / O'Connor, James T. (2012): Analysis of information integration benefit drivers and implementation hindrances. In: Automation in Construction, v. 22 (März 2012).
https://doi.org/10.1016/j.autcon.2011.09.003
-
Yang, Li-Ren / O'Connor, James T. / Chen, Jieh-Haur (2007): Assessment of automation and integration technology's impacts on project stakeholder success. In: Automation in Construction, v. 16, n. 6 (September 2007).
https://doi.org/10.1016/j.autcon.2006.11.005
-
O'Connor, James T. / Dodd, Steven C. (2000): Achieving integration on capital projects with enterprise resource planning systems. In: Automation in Construction, v. 9, n. 5-6 (September 2000).
https://doi.org/10.1016/s0926-5805(00)00062-5
-
O'Connor, James T. / O'Brien, William J. / Choi, Jin Ouk (2014): Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization. In: Journal of Construction Engineering and Management, v. 140, n. 6 (Juni 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000842
-
O'Connor, James T. / Huh, Youngki (2005): Crew Production Rates for Contract Time Estimation: Bent Footing, Column, and Cap of Highway Bridges. In: Journal of Construction Engineering and Management, v. 131, n. 9 (September 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:9(1013)
-
O'Connor, James T. / Miller, Steven J. (1994): Constructability Programs: Method for Assessment and Benchmarking. In: Journal of Performance of Constructed Facilities (ASCE), v. 8, n. 1 (Februar 1994).
https://doi.org/10.1061/(asce)0887-3828(1994)8:1(46)
-
O'Connor, James T. / Miller, Steven J. (1994): Barriers to Constructability Implementation. In: Journal of Performance of Constructed Facilities (ASCE), v. 8, n. 2 (Mai 1994).
https://doi.org/10.1061/(asce)0887-3828(1994)8:2(110)
-
O'Connor, James T. / Chmaytelli, Aref / Hugo, Fred (1993): Analysis of Highway Project Construction Claims. In: Journal of Performance of Constructed Facilities (ASCE), v. 7, n. 3 (August 1993).
https://doi.org/10.1061/(asce)0887-3828(1993)7:3(170)
-
O'Connor, James T. / Choi, Jin Ouk / Winkler, Matthew (2016): Critical Success Factors for Commissioning and Start-Up of Capital Projects. In: Journal of Construction Engineering and Management, v. 142, n. 11 (November 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001179
-
Leandro, Roberto / O'Connor, James T. / Khwaja, Nabeel (2018): Development and Application of a Production-Rate Resource for Contract Time Determination. In: Journal of Construction Engineering and Management, v. 144, n. 12 (Dezember 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001572