Woo, Jeyoung / O'Connor, James T. (2021): Mitigation Strategies to Prevent Engineering Design Quality Defects. In: Journal of Management in Engineering (ASCE), v. 37, n. 3 (Mai 2021).
https://doi.org/10.1061/(asce)me.1943-5479.0000898
-
O'Connor, James T. / Shrestha, Binit K. / Winkler, Matthew / Choi, Jin Ouk (2021): Relationship between Commissioning and Start-Up Success Factors Achievement and Performance in Capital Projects. In: Journal of Construction Engineering and Management, v. 147, n. 3 (März 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0001999
-
O'Connor, James T. / Koo, Hyun Jeong (2021): Proactive Design Quality Assessment Tool for Building Projects. In: Journal of Construction Engineering and Management, v. 147, n. 2 (Februar 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0001980
-
Choi, Jin Ouk / O'Connor, James T. / Kwak, Young Hoon / Shrestha, Binit K. (2019): Modularization Business Case Analysis Model for Industrial Projects. In: Journal of Management in Engineering (ASCE), v. 35, n. 3 (Mai 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000683
-
Khwaja, Nabeel / O'Brien, William J. / Martinez, Mayra / Sankaran, Bharathwaj / O'Connor, James T. / Hale, William "Bill" (2018): Innovations in Project Delivery Method Selection Approach in the Texas Department of Transportation. In: Journal of Management in Engineering (ASCE), v. 34, n. 6 (November 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000645
-
O'Connor, James T. / Woo, Jeyoung (2017): Proactive Approach to Engineering and Design Deliverables Quality Enhancement. In: Journal of Management in Engineering (ASCE), v. 33, n. 4 (Juli 2017).
https://doi.org/10.1061/(asce)me.1943-5479.0000508
-
Kang, Youngcheol / O'Brien, William J. / O'Connor, James T. (2015): Information-Integration Maturity Model for the Capital Projects Industry. In: Journal of Management in Engineering (ASCE), v. 31, n. 4 (Juli 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000274
-
Kim, Dae Young / Menches, Cindy L. / O'Connor, James T. (2015): Stringing Construction Planning and Execution Tasks Together for Effective Project Management. In: Journal of Management in Engineering (ASCE), v. 31, n. 3 (Mai 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000267
-
Kang, Youngcheol / O'Brien, William J. / O'Connor, James T. (2012): IOP Tool: Assessing the Benefits and Hindrances of Information Integration Implementation Opportunities. In: Journal of Management in Engineering (ASCE), v. 28, n. 2 (April 2012).
https://doi.org/10.1061/(asce)me.1943-5479.0000066
-
O'Connor, James T. / Wahba, Gillian G. (1987): Preconstruction Delays on Municipal Projects. In: Journal of Management in Engineering (ASCE), v. 3, n. 3 (Juli 1987).
https://doi.org/10.1061/(asce)9742-597x(1987)3:3(239)
-
El-Diraby, Tamer E. / O'Connor, James T. (2004): Lessons Learned in Designing Research Methodology in Field-Based Construction Research. In: Journal of Professional Issues in Engineering Education and Practice, v. 130, n. 2 (April 2004).
https://doi.org/10.1061/(asce)1052-3928(2004)130:2(109)
-
Ellzey, Janet L. / O'Connor, James T. / Westerman, Julie (2019): Projects with Underserved Communities: Case Study of an International Project-Based Service-Learning Program. In: Journal of Professional Issues in Engineering Education and Practice, v. 145, n. 2 (April 2019).
https://doi.org/10.1061/(asce)ei.1943-5541.0000400
-
Han, Seungheon / Choi, Jin Ouk / O'Connor, James T. (2017): Quality of Baseline Schedules: Lessons from Higher Education Capital Facility Projects. In: Journal of Professional Issues in Engineering Education and Practice, v. 143, n. 1 (Januar 2017).
https://doi.org/10.1061/(asce)ei.1943-5541.0000302
-
Mock, Brant / O'Connor, James T. (2019): Owner and contractor solution strategies for industrial commissioning. In: Construction Innovation, v. 19, n. 2 (April 2019).
https://doi.org/10.1108/ci-09-2018-0079
-
O'Connor, James T. / Tucker, Richard L. (1986): Industrial Project Constructability Improvement. In: Journal of Construction Engineering and Management, v. 112, n. 1 (März 1986).
https://doi.org/10.1061/(asce)0733-9364(1986)112:1(69)
-
O'Connor, James T. (1985): Impacts of Constructability Improvement. In: Journal of Construction Engineering and Management, v. 111, n. 4 (Dezember 1985).
https://doi.org/10.1061/(asce)0733-9364(1985)111:4(404)
-
O'Connor, James T. / Caraway, Patrick H. (1993): Need for Specification Format that Accommodates Engineered Projects. In: Journal of Construction Engineering and Management, v. 119, n. 4 (Dezember 1993).
https://doi.org/10.1061/(asce)0733-9364(1993)119:4(757)
-
El-Diraby, Tamer E. / O'Connor, James T. (2001): Model for Evaluating Bridge Construction Plans. In: Journal of Construction Engineering and Management, v. 127, n. 5 (Oktober 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:5(399)
-
Choi, Jin Ouk / O'Connor, James T. / Kim, Tae Wan (2016): Recipes for Cost and Schedule Successes in Industrial Modular Projects: Qualitative Comparative Analysis. In: Journal of Construction Engineering and Management, v. 142, n. 10 (Oktober 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001171
-
O'Connor, James T. / O'Brien, William J. / Choi, Jin Ouk (2015): Standardization Strategy for Modular Industrial Plants. In: Journal of Construction Engineering and Management, v. 141, n. 9 (September 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0001001
-
Tucker, Richard L. / O'Connor, James T. / Gatton, Thomas M. / Gibson, G. Edward / Haas, Carl T. / Hudson, David N. (1994): The Impact of Computer Technology on Construction's Future. In: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 1 (Januar 1994).
https://doi.org/10.1111/j.1467-8667.1994.tb00357.x
-
Cheng, Min-Yuan / O'Connor, James T. (1994): Site layout of construction temporary facilities using an enhanced-geographic information system (GIS). In: Automation in Construction, v. 3, n. 1 (Mai 1994).
https://doi.org/10.1016/0926-5805(94)90028-0
-
Chou, Jui-Sheng / O'Connor, James T. (2007): Internet-based preliminary highway construction cost estimating database. In: Automation in Construction, v. 17, n. 1 (November 2007).
https://doi.org/10.1016/j.autcon.2007.03.001
-
Cha, Hee Sung / O'Connor, James T. (2005): Optimizing Implementation of Value Management Processes for Capital Projects. In: Journal of Construction Engineering and Management, v. 131, n. 2 (Februar 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:2(239)
-
O'Connor, James T. / Torres, Neftali / Woo, Jeyoung (2016): Sustainability Actions during the Construction Phase. In: Journal of Construction Engineering and Management, v. 142, n. 7 (Juli 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001128
-
O'Connor, James T. / O'Brien, William J. / Choi, Jin Ouk (2016): Industrial Project Execution Planning: Modularization versus Stick-Built. In: Practice Periodical on Structural Design and Construction, v. 21, n. 1 (Februar 2016).
https://doi.org/10.1061/(asce)sc.1943-5576.0000270
-
O'Connor, James T. / Miller, Steven J. (1995): Overcoming Barriers to Successful Constructability Implementation Efforts. In: Journal of Performance of Constructed Facilities (ASCE), v. 9, n. 2 ( 1995).
https://doi.org/10.1061/(asce)0887-3828(1995)9:2(117)
-
Shrestha, Pramen P. / O'Connor, James T. / Gibson, G. Edward (2012): Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects. In: Journal of Construction Engineering and Management, v. 138, n. 1 (Januar 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000390
-
Chou, Chien-Cheng / Caldas, Carlos H. / O'Connor, James T. / Sroka, Adam W. / Goldman, Grant K. (2009): Identification of Decision Drivers for the Strategy of Incorporating Utility Relocations into Highway Construction Contracts. In: Journal of Construction Engineering and Management, v. 135, n. 9 (September 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:9(812)
-
O'Connor, James T. / Yang, Li-Ren (2004): Project Performance versus Use of Technologies at Project and Phase Levels. In: Journal of Construction Engineering and Management, v. 130, n. 3 (Juni 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:3(322)