Estimating Highway Construction Production Rates during Design: Elements of a Useful Estimation Tool
Author(s): |
Wai Kiong Chong
Sang-Hoon Lee James T. O'Connor |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Leadership and Management in Engineering (ASCE), July 2011, n. 3, v. 11 |
Page(s): | 258-266 |
DOI: | 10.1061/(asce)lm.1943-5630.0000135 |
- About this
data sheet - Reference-ID
10257701 - Published on:
30/12/2018 - Last updated on:
30/12/2018