0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Ju, Chuanjing / Ning, Yan / Shen, Yuzhong: How do different management control configurations influence construction safety professionals' work attitudes. In: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-07-2023-0745

  2. Lin, Wensheng / Wang, Guangbin / Ning, Yan / Ma, Qiuwen / Dai, Shuyuan: The effects of performance measurement on megaproject performance: the moderating effects of project complexity. In: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-02-2023-0107

  3. Li, Yadi / Ning, Yan / Rowlinson, Steve (2023): Social Control in Outsourced Architectural and Engineering Design Consulting Projects: Behavioral Consequences and Motivational Mechanism. In: Journal of Construction Engineering and Management, v. 149, n. 4 (April 2023).

    https://doi.org/10.1061/jcemd4.coeng-12531

  4. Ning, Yan / Ling, Florence Yean Yng (2022): Selecting control strategies in projects of intangible outputs: empirical evidence from architectural and engineering design projects. In: Engineering, Construction and Architectural Management, v. 30, n. 10 (August 2022).

    https://doi.org/10.1108/ecam-02-2019-0116

  5. Ning, Yan / Kwak, Young Hoon (2022): How Do Consulting Firms with Different Project Experience Configure Dynamic Capabilities?. In: Journal of Management in Engineering (ASCE), v. 38, n. 4 (July 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001046

  6. Li, Yadi / Ning, Yan (2022): Mitigating Opportunistic Behaviors in Consulting Projects: Evidence from the Outsourced Architectural and Engineering Design. In: Journal of Construction Engineering and Management, v. 148, n. 7 (July 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002305

  7. Zhang, Lei / Yuan, Jingfeng / Ning, Yan / Xia, Nini / Zhang, Guodong (2021): Enhancing the impacts of absorptive capacity on interorganizational collaboration in BIM-enabled construction projects – an SLT perspective. In: Engineering, Construction and Architectural Management, v. 29, n. 10 (October 2021).

    https://doi.org/10.1108/ecam-11-2020-0931

  8. Ju, Chuanjing / Ning, Yan (2022): Integrating interorganizational justice to facilitate tacit knowledge sharing in architectural and engineering design projects: a configurational approach. In: Engineering, Construction and Architectural Management, v. 29, n. 9 (August 2022).

    https://doi.org/10.1108/ecam-01-2021-0019

  9. Li, Yadi / Ning, Yan / Rowlinson, Steve (2021): Interaction of Interorganizational and Intraorganizational Controls in Shaping Professionals’ Behaviors in Outsourced Architectural and Engineering Design Consulting Projects. In: Journal of Management in Engineering (ASCE), v. 37, n. 6 (November 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000956

  10. Chen, Guangchong / Chen, Jiayu / Tang, Yuchun / Ning, Yan / Li, Qiming (2021): Collaboration strategy selection in BIM-enabled construction projects: a perspective through typical collaboration profiles. In: Engineering, Construction and Architectural Management, v. 29, n. 7 (July 2021).

    https://doi.org/10.1108/ecam-01-2021-0004

  11. Ling, Florence Y. Y. / Tan, Peng Chong / Ning, Yan / Teo, Albert / Gunawansa, Asanga (2015): Effect of adoption of relational contracting practices on relationship quality in public projects in Singapore. In: Engineering, Construction and Architectural Management, v. 22, n. 2 (March 2015).

    https://doi.org/10.1108/ecam-10-2013-0093

  12. Ling, Florence Yean Yng / Ning, Yan / Chang, Yi Hao / Zhang, Zhe (2018): Human resource management practices to improve project managers’ job satisfaction. In: Engineering, Construction and Architectural Management, v. 25, n. 5 (June 2018).

    https://doi.org/10.1108/ecam-02-2017-0030

  13. Ning, Yan / Feng, Minjie / Feng, Jin / Liu, Xiao (2019): Understanding clients’ experience of trust and distrust in dwelling fit-out projects. An ambivalence approach. In: Engineering, Construction and Architectural Management, v. 26, n. 3 (April 2019).

    https://doi.org/10.1108/ecam-03-2018-0115

  14. Li, Yadi / Liu, Xiao / Ning, Yan (2021): Disentangling the failure of benefits realization in public institutional building projects: a paradoxical understanding of formalization. In: Journal of Asian Architecture and Building Engineering, v. 21, n. 2 (March 2021).

    https://doi.org/10.1080/13467581.2020.1869015

  15. Zhang, Lei / Yuan, Jingfeng / Xia, Nini / Ning, Yan / Ma, Junwei / Skibniewski, Mirosław J. (2020): Measuring Value-Added-Oriented BIM Climate in Construction Projects: Dimensions and Indicators. In: Journal of Civil Engineering and Management, v. 26, n. 8 (5 November 2020).

    https://doi.org/10.3846/jcem.2020.13893

  16. Yan, Ling / Guo, Liang / Ning, Yan (2020): Understanding Construction Contractors’ Intention to Undertake Consummate Performance Behaviors in Construction Projects. In: Advances in Civil Engineering, v. 2020 (January 2020).

    https://doi.org/10.1155/2020/3935843

  17. Pan, Wei / Ning, Yan (2014): Dialectics of sustainable building: Evidence from empirical studies 1987–2013. In: Building and Environment, v. 82 (December 2014).

    https://doi.org/10.1016/j.buildenv.2014.10.008

  18. Pan, Wei / Ning, Yan (2015): A socio-technical framework of zero-carbon building policies. In: Building Research & Information, v. 43, n. 1 ( 2015).

    https://doi.org/10.1080/09613218.2015.955759

  19. Ke, Yongjian / Ling, Florence Y. Y. / Ning, Yan / Zhang, Zhe (2019): Managing relationships in large public projects: comparative study of China and Singapore. In: Built Environment Project and Asset Management, v. 9, n. 3 (July 2019).

    https://doi.org/10.1108/bepam-10-2018-0128

  20. Ning, Yan / Ling, Florence Yean Yng / Teo, Albert Chu Ying (2014): Driving Forces behind and Barriers to Relational Transaction Practices in Public Construction Projects. In: Journal of Professional Issues in Engineering Education and Practice, v. 140, n. 1 (January 2014).

    https://doi.org/10.1061/(asce)ei.1943-5541.0000167

  21. Ning, Yan / Ling, Florence Yean Yng (2013): Reducing Hindrances to Adoption of Relational Behaviors in Public Construction Projects. In: Journal of Construction Engineering and Management, v. 139, n. 11 (November 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000745

  22. Ling, Florence Y. Y. / Ning, Yan / Ke, Yongjian / Kumaraswamy, Mohan M. (2013): Modeling relational transaction and relationship quality among team members in public projects in Hong Kong. In: Automation in Construction, v. 36 (December 2013).

    https://doi.org/10.1016/j.autcon.2013.08.006

  23. Ning, Yan / Ling, Florence Yean Yng (2014): Boosting Public Construction Project Outcomes through Relational Transactions. In: Journal of Construction Engineering and Management, v. 140, n. 1 (January 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000780

  24. Li, Yadi / Ning, Yan / Tong Chen, Wei (2018): Critical Success Factors for Safety Management of High-Rise Building Construction Projects in China. In: Advances in Civil Engineering, v. 2018 ( 2018).

    https://doi.org/10.1155/2018/1516354

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine