-
Khazen, Mohammadali / Nik-Bakht, Mazdak / Moselhi, Osama (2024): Monitoring workers on indoor construction sites using data fusion of real-time worker's location, body orientation, and productivity state. In: Automation in Construction, v. 160 (April 2024).
https://doi.org/10.1016/j.autcon.2024.105327
-
Bardareh, Hassan / Moselhi, Osama (2022): An integrated RFID–UWB method for indoor localization of materials in construction. In: Journal of Information Technology in Construction, v. 27 (January 2022).
https://doi.org/10.36680/j.itcon.2022.032
-
Mohammed, Azhar / Kaddoura, Khalid / Zayed, Tarek / Moselhi, Osama / Hawari, Alaa (2022): Integrated Reliability Assessment Model for Drinking Water Networks: A Case Study of the City of London, Canada. In: Journal of Performance of Constructed Facilities (ASCE), v. 36, n. 5 (October 2022).
https://doi.org/10.1061/(asce)cf.1943-5509.0001747
-
Salama, Tarek / Salah, Ahmad / Moselhi, Osama (2021): Integrating critical chain project management with last planner system for linear scheduling of modular construction. In: Construction Innovation, v. 21, n. 4 (August 2021).
https://doi.org/10.1108/ci-05-2018-0046
-
Mohammed Abdelkader, Eslam / Moselhi, Osama / Marzouk, Mohamed / Zayed, Tarek (2021): Integrative Evolutionary-Based Method for Modeling and Optimizing Budget Assignment of Bridge Maintenance Priorities. In: Journal of Construction Engineering and Management, v. 147, n. 9 (September 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002113
-
Islam, Tushith / Moselhi, Osama (2012): Modeling Geospatial Interdependence for Integrated Municipal Infrastructure. In: Journal of Infrastructure Systems, v. 18, n. 2 (June 2012).
https://doi.org/10.1061/(asce)is.1943-555x.0000065
-
Moselhi, Osama / Alkass, Sabah / Al‐Hussein, Mohamed (2004): Innovative 3D‐modelling for selecting and locating mobile cranes. In: Engineering, Construction and Architectural Management, v. 11, n. 5 (October 2004).
https://doi.org/10.1108/09699980410558575
-
Li, Ji / Moselhi, Osama / Alkass, Sabah (2006): Internet‐based database management system for project control. In: Engineering, Construction and Architectural Management, v. 13, n. 3 (May 2006).
https://doi.org/10.1108/09699980610669679
-
Roghabadi, Mohammadjavad Arabpour / Moselhi, Osama (2021): Optimized crew selection for scheduling of repetitive projects. In: Engineering, Construction and Architectural Management, v. 28, n. 6 ( 2021).
https://doi.org/10.1108/ecam-10-2019-0590
-
Salama, Tarek / Moselhi, Osama (2019): Multi-objective optimization for repetitive scheduling under uncertainty. In: Engineering, Construction and Architectural Management, v. 26, n. 7 (August 2019).
https://doi.org/10.1108/ecam-05-2018-0217
-
Yousefli, Zahra / Nasiri, Fuzhan / Moselhi, Osama (2020): Maintenance workflow management in hospitals: An automated multi-agent facility management system. In: Journal of Building Engineering, v. 32 (November 2020).
https://doi.org/10.1016/j.jobe.2020.101431
-
Golkhoo, Farzaneh / Moselhi, Osama (2019): Optimized Material Management in Construction using Multi-Layer Perceptron. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 46, n. 10 (October 2019).
https://doi.org/10.1139/cjce-2018-0149
-
Moselhi, Osama / Hegazy, Tarek / Fazio, Paul (1991): Neural Networks as Tools in Construction. In: Journal of Construction Engineering and Management, v. 117, n. 4 (December 1991).
https://doi.org/10.1061/(asce)0733-9364(1991)117:4(606)
-
El-Omari, Samir / Moselhi, Osama (2011): Integrating automated data acquisition technologies for progress reporting of construction projects. In: Automation in Construction, v. 20, n. 6 (October 2011).
https://doi.org/10.1016/j.autcon.2010.12.001
-
Salama, Tarek / Salah, Ahmad / Moselhi, Osama / Al-Hussein, Mohamed (2017): Near optimum selection of module configuration for efficient modular construction. In: Automation in Construction, v. 83 (November 2017).
https://doi.org/10.1016/j.autcon.2017.03.008
-
El-Omari, Samir / Moselhi, Osama (2008): Integrating 3D laser scanning and photogrammetry for progress measurement of construction work. In: Automation in Construction, v. 18, n. 1 (December 2008).
https://doi.org/10.1016/j.autcon.2008.05.006
-
Atef, Ahmed / Zayed, Tarek / Hawari, Alaa / Khader, Mohammad / Moselhi, Osama (2016): Multi-tier method using infrared photography and GPR to detect and locate water leaks. In: Automation in Construction, v. 61 (January 2016).
https://doi.org/10.1016/j.autcon.2015.10.006
-
Bakry, Ibrahim / Moselhi, Osama / Zayed, Tarek (2014): Optimized acceleration of repetitive construction projects. In: Automation in Construction, v. 39 (April 2014).
https://doi.org/10.1016/j.autcon.2013.07.003
-
Marzouk, Mohamed / Moselhi, Osama (2004): Multiobjective Optimization of Earthmoving Operations. In: Journal of Construction Engineering and Management, v. 130, n. 1 (February 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:1(105)
-
Al-Hussein, Mohamed / Alkass, Sabah / Moselhi, Osama (2005): Optimization Algorithm for Selection and on Site Location of Mobile Cranes. In: Journal of Construction Engineering and Management, v. 131, n. 5 (May 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:5(579)
-
Moselhi, Osama / Alshibani, Adel (2009): Optimization of Earthmoving Operations in Heavy Civil Engineering Projects. In: Journal of Construction Engineering and Management, v. 135, n. 10 (October 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:10(948)
-
El-Rayes, Khaled / Ramanathan, Ramaneetharan / Moselhi, Osama (2002): An object-oriented model for planning and control of housing construction. In: Construction Management and Economics, v. 20, n. 3 (April 2002).
https://doi.org/10.1080/01446190110115312
-
Moselhi, Osama / Lorterapong, Pasit (1993): Near optimal solution for resource-constrained scheduling problems. In: Construction Management and Economics, v. 11, n. 4 (July 1993).
https://doi.org/10.1080/01446199300000029
-
Moselhi, Osama / Lorterapong, Pasit (1993): Least impact algorithm for resource allocation. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 20, n. 2 (April 1993).
https://doi.org/10.1139/l93-023
-
Moselhi, Osama / El-Rayes, Khaled (1993): Least cost scheduling for repetitive projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 20, n. 5 (October 1993).
https://doi.org/10.1139/l93-109
-
Alshibani, Adel / Moselhi, Osama (2012): Least cost optimization of scraper–pusher fleet operations. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 3 (March 2012).
https://doi.org/10.1139/l2012-005
-
Atef, Ahmed / Osman, Hesham / Moselhi, Osama (2012): Multiobjective genetic algorithm to allocate budgetary resources for condition assessment of water and sewer networks. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (September 2012).
https://doi.org/10.1139/l2012-049
-
Moselhi, Osama / Ahmed, Marwa / Bhowmick, Anjan (2017): Multisensor Data Fusion for Bridge Condition Assessment. In: Journal of Performance of Constructed Facilities (ASCE), v. 31, n. 4 (August 2017).
https://doi.org/10.1061/(asce)cf.1943-5509.0001000
-
Marzouk, Mohamed / Moselhi, Osama (2003): Object-oriented Simulation Model for Earthmoving Operations. In: Journal of Construction Engineering and Management, v. 129, n. 2 (March - April 2003).
https://doi.org/10.1061/(asce)0733-9364(2003)129:2(173)
-
Salama, Tarek / Salah, Ahmad / Moselhi, Osama (2018): Integration of linear scheduling method and the critical chain project management. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 45, n. 1 (January 2018).
https://doi.org/10.1139/cjce-2017-0020