Integrating critical chain project management with last planner system for linear scheduling of modular construction
Author(s): |
Tarek Salama
Ahmad Salah Osama Moselhi |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Construction Innovation, August 2021, n. 4, v. 21 |
Page(s): | 525-554 |
DOI: | 10.1108/ci-05-2018-0046 |
- About this
data sheet - Reference-ID
10625832 - Published on:
26/08/2021 - Last updated on:
29/11/2021