0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Integrating critical chain project management with last planner system for linear scheduling of modular construction

This publication lists 53 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10625832
  • Published on:
    26/08/2021
  • Last updated on:
    29/11/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine