Integrative Evolutionary-Based Method for Modeling and Optimizing Budget Assignment of Bridge Maintenance Priorities
Author(s): |
Eslam Mohammed Abdelkader
Osama Moselhi Mohamed Marzouk Tarek Zayed |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, September 2021, n. 9, v. 147 |
Page(s): | 04021100 |
DOI: | 10.1061/(asce)co.1943-7862.0002113 |
- About this
data sheet - Reference-ID
10612390 - Published on:
09/07/2021 - Last updated on:
09/07/2021