- Using AHP to prioritize the corruption risk practices in the Iraqi construction sector. In: Asian Journal of Civil Engineering, v. 22, n. 7 (September 2021). (2021):
- Using measured mile method to quantify the loss of labor productivity in Iraqi construction site. In: Asian Journal of Civil Engineering, v. 21, n. 7 (June 2020). (2020):
- Integrated project delivery (IPD) method with BIM to improve the project performance: a case study in the Republic of Iraq. In: Asian Journal of Civil Engineering, v. 21, n. 6 (June 2020). (2020):