0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Using measured mile method to quantify the loss of labor productivity in Iraqi construction site

Author(s):

Medium: journal article
Language(s): English
Published in: Asian Journal of Civil Engineering, , n. 7, v. 21
Page(s): 1287-1296
DOI: 10.1007/s42107-020-00277-5
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s42107-020-00277-5.
  • About this
    data sheet
  • Reference-ID
    10426538
  • Published on:
    13/07/2020
  • Last updated on:
    30/07/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine