0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Integrated project delivery (IPD) method with BIM to improve the project performance: a case study in the Republic of Iraq

Author(s):

Medium: journal article
Language(s): English
Published in: Asian Journal of Civil Engineering, , n. 6, v. 21
Page(s): 947-957
DOI: 10.1007/s42107-020-00251-1
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s42107-020-00251-1.
  • About this
    data sheet
  • Reference-ID
    10420062
  • Published on:
    16/04/2020
  • Last updated on:
    22/06/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine