0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Regan, M. / Love, P. E. D. / Smith, J. (2013): Public-Private Partnerships: Capital Market Conditions and Alternative Finance Mechanisms for Australian Infrastructure Projects. In: Journal of Infrastructure Systems, v. 19, n. 3 (September 2013).

    https://doi.org/10.1061/(asce)is.1943-555x.0000136

  2. Love, P. E. D. / Smith, J. / Treloar, G. J. / Li, H. (2000): Some empirical observations of service quality in construction. In: Engineering, Construction and Architectural Management, v. 7, n. 2 (February 2000).

    https://doi.org/10.1108/eb021144

  3. Li, H. / Love, P. E. D. / Drew, D. S. (2000): Effects of overtime work and additional resources on project cost and quality. In: Engineering, Construction and Architectural Management, v. 7, n. 3 (March 2000).

    https://doi.org/10.1108/eb021146

  4. Pong Sing, Chun / Love, P. E. D. / Davis, P. R. (2014): Experimental study on condition assessment of reinforced concrete structure using a dynamics response approach. In: Structural Survey, v. 32, n. 2 (May 2014).

    https://doi.org/10.1108/ss-02-2013-0017

  5. Georgiou, J. / Love, P. E. D. / Smith, Jim (2000): A review of builder registration in the state of Victoria, Australia. In: Structural Survey, v. 18, n. 1 (March 2000).

    https://doi.org/10.1108/02630800010322526

  6. Georgiou, J. / Love, P. E. D. / Smith, J. (1999): A comparison of defects in houses constructed by owners and registered builders in the Australian State of Victoria. In: Structural Survey, v. 17, n. 3 (September 1999).

    https://doi.org/10.1108/02630809910291343

  7. Sing, Michael C. P. / Love, P. E. D. / Edwards, D. J. / Liu, Junxiao (2016): Dynamic Modeling of Workforce Planning for Infrastructure Projects. In: Journal of Management in Engineering (ASCE), v. 32, n. 6 (November 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000463

  8. Love, P. E. D. / Ackermann, F. / Carey, B. / Morrison, J. / Ward, M. / Park, A. (2016): Praxis of Rework Mitigation in Construction. In: Journal of Management in Engineering (ASCE), v. 32, n. 5 (September 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000442

  9. Cheng, Eddie W. L. / Li, Heng / Love, P. E. D. (2000): Establishment of Critical Success Factors for Construction Partnering. In: Journal of Management in Engineering (ASCE), v. 16, n. 2 (March 2000).

    https://doi.org/10.1061/(asce)0742-597x(2000)16:2(84)

  10. Crawford, R. H. / Treloar, G. J. / Ilozor, B. D. / Love, P. E. D. (2003): Comparative greenhouse emissions analysis of domestic solar hot water systems. In: Building Research & Information, v. 31, n. 1 ( 2003).

    https://doi.org/10.1080/09613210210160800

  11. Treloar, G. / Fay, R. / Love, P. E. D. / Iyer-Raniga, U. (2000): Analysing the life-cycle energy of an Australian residential building and its householders. In: Building Research & Information, v. 28, n. 3 ( 2000).

    https://doi.org/10.1080/096132100368957

  12. Kong, C. W. / Li, H. / Love, P. E. D. (2001): An e‐commerce system for construction material procurement. In: Construction Innovation, v. 1, n. 1 (March 2001).

    https://doi.org/10.1108/14714170110814505

  13. Li, Heng / Cao, J.-N. / Love, P. E. D. (1999): Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems. In: Journal of Construction Engineering and Management, v. 125, n. 5 (September 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:5(347)

  14. Li, H. / Shen, L. Y. / Love, P. E. D. (1999): ANN-Based Mark-Up Estimation System with Self-Explanatory Capacities. In: Journal of Construction Engineering and Management, v. 125, n. 3 (June 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:3(185)

  15. Sing, Chun-Pong / Love, P. E. D. / Tam, C. M. (2012): Stock-Flow Model for Forecasting Labor Supply. In: Journal of Construction Engineering and Management, v. 138, n. 6 (June 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000485

  16. Deng, Z. M. / Li, H. / Tam, C. M. / Shen, Q. P. / Love, P. E. D. (2001): An application of the Internet-based project management system. In: Automation in Construction, v. 10, n. 2 (January 2001).

    https://doi.org/10.1016/s0926-5805(99)00037-0

  17. Yang, J. / Edwards, D. J. / Love, P. E. D. (2004): Measuring the impact of daily workload upon plant operator production performance using Artificial Neural Networks. In: Civil Engineering and Environmental Systems, v. 21, n. 4 (December 2004).

    https://doi.org/10.1080/10286608412331333220

  18. Zhou, J. / Love, P. E. D. / Matthews, J. / Carey, B. / Sing, C. P. (2015): Object-oriented model for life cycle management of electrical instrumentation control projects. In: Automation in Construction, v. 49 (January 2015).

    https://doi.org/10.1016/j.autcon.2014.10.008

  19. Love, P. E. D. / Zhou, J. / Matthews, J. / Sing, M. C. P. / Edwards, D. J. (2017): System information modelling in practice: Analysis of tender documentation quality in a mining mega-project. In: Automation in Construction, v. 84 (December 2017).

    https://doi.org/10.1016/j.autcon.2017.08.034

  20. Sing, Michael C. P. / Edwards, D. J. / Liu, Henry J. X. / Love, P. E. D. (2015): Forecasting Private-Sector Construction Works: VAR Model Using Economic Indicators. In: Journal of Construction Engineering and Management, v. 141, n. 11 (November 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0001016

  21. Olaniran, O. J. / Love, P. E. D. / Edwards, D. J. / Olatunji, O. / Matthews, J. (2017): Chaos Theory: Implications for Cost Overrun Research in Hydrocarbon Megaprojects. In: Journal of Construction Engineering and Management, v. 143, n. 2 (February 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001227

  22. Treloar, G. J. / Love, P. E. D. / Faniran, O. O. / Iyer-Raniga, U. (2000): A hybrid life cycle assessment method for construction. In: Construction Management and Economics, v. 18, n. 1 (January 2000).

    https://doi.org/10.1080/014461900370898

  23. Love, P. E. D. / Li, H. (2000): Overcoming the problems associated with quality certification. In: Construction Management and Economics, v. 18, n. 2 (March 2000).

    https://doi.org/10.1080/014461900370771

  24. Love, P. E. D. / Skitmore, M. / Earl, G. (1998): Selecting a suitable procurement method for a building project. In: Construction Management and Economics, v. 16, n. 2 (March 1998).

    https://doi.org/10.1080/014461998372501

  25. Li, Heng / Love, P. E. D. (1998): Developing a theory of construction problem solving. In: Construction Management and Economics, v. 16, n. 6 (November 1998).

    https://doi.org/10.1080/014461998372015

  26. Love, P. E. D. / Mandal, P. / Li, H. (1999): Determining the causal structure of rework influences in construction. In: Construction Management and Economics, v. 17, n. 4 (July 1999).

    https://doi.org/10.1080/014461999371420

  27. Sing, C. P. / Chan, H. C. / Love, P. E. D. / Leung, A. Y. T. (2016): Building Maintenance and Repair: Determining the Workforce Demand and Supply for a Mandatory Building-Inspection Scheme. In: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 2 (April 2016).

    https://doi.org/10.1061/(asce)cf.1943-5509.0000755

  28. Sing, C. P. / Love, P. E. D. / Fung, I. W. H. / Edwards, D. J. (2014): Personality and Occupational Accidents: Bar Benders in Guangdong Province, Shenzhen, China. In: Journal of Construction Engineering and Management, v. 140, n. 7 (July 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000858

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine