0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Regan, M. / Love, P. E. D. / Smith, J. (2013): Public-Private Partnerships: Capital Market Conditions and Alternative Finance Mechanisms for Australian Infrastructure Projects. Dans: Journal of Infrastructure Systems, v. 19, n. 3 (septembre 2013).

    https://doi.org/10.1061/(asce)is.1943-555x.0000136

  2. Love, P. E. D. / Smith, J. / Treloar, G. J. / Li, H. (2000): Some empirical observations of service quality in construction. Dans: Engineering, Construction and Architectural Management, v. 7, n. 2 (février 2000).

    https://doi.org/10.1108/eb021144

  3. Li, H. / Love, P. E. D. / Drew, D. S. (2000): Effects of overtime work and additional resources on project cost and quality. Dans: Engineering, Construction and Architectural Management, v. 7, n. 3 (mars 2000).

    https://doi.org/10.1108/eb021146

  4. Pong Sing, Chun / Love, P. E. D. / Davis, P. R. (2014): Experimental study on condition assessment of reinforced concrete structure using a dynamics response approach. Dans: Structural Survey, v. 32, n. 2 (mai 2014).

    https://doi.org/10.1108/ss-02-2013-0017

  5. Georgiou, J. / Love, P. E. D. / Smith, Jim (2000): A review of builder registration in the state of Victoria, Australia. Dans: Structural Survey, v. 18, n. 1 (mars 2000).

    https://doi.org/10.1108/02630800010322526

  6. Georgiou, J. / Love, P. E. D. / Smith, J. (1999): A comparison of defects in houses constructed by owners and registered builders in the Australian State of Victoria. Dans: Structural Survey, v. 17, n. 3 (septembre 1999).

    https://doi.org/10.1108/02630809910291343

  7. Sing, Michael C. P. / Love, P. E. D. / Edwards, D. J. / Liu, Junxiao (2016): Dynamic Modeling of Workforce Planning for Infrastructure Projects. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 6 (novembre 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000463

  8. Love, P. E. D. / Ackermann, F. / Carey, B. / Morrison, J. / Ward, M. / Park, A. (2016): Praxis of Rework Mitigation in Construction. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 5 (septembre 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000442

  9. Cheng, Eddie W. L. / Li, Heng / Love, P. E. D. (2000): Establishment of Critical Success Factors for Construction Partnering. Dans: Journal of Management in Engineering (ASCE), v. 16, n. 2 (mars 2000).

    https://doi.org/10.1061/(asce)0742-597x(2000)16:2(84)

  10. Crawford, R. H. / Treloar, G. J. / Ilozor, B. D. / Love, P. E. D. (2003): Comparative greenhouse emissions analysis of domestic solar hot water systems. Dans: Building Research & Information, v. 31, n. 1 ( 2003).

    https://doi.org/10.1080/09613210210160800

  11. Treloar, G. / Fay, R. / Love, P. E. D. / Iyer-Raniga, U. (2000): Analysing the life-cycle energy of an Australian residential building and its householders. Dans: Building Research & Information, v. 28, n. 3 ( 2000).

    https://doi.org/10.1080/096132100368957

  12. Kong, C. W. / Li, H. / Love, P. E. D. (2001): An e‐commerce system for construction material procurement. Dans: Construction Innovation, v. 1, n. 1 (mars 2001).

    https://doi.org/10.1108/14714170110814505

  13. Li, Heng / Cao, J.-N. / Love, P. E. D. (1999): Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems. Dans: Journal of Construction Engineering and Management, v. 125, n. 5 (septembre 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:5(347)

  14. Li, H. / Shen, L. Y. / Love, P. E. D. (1999): ANN-Based Mark-Up Estimation System with Self-Explanatory Capacities. Dans: Journal of Construction Engineering and Management, v. 125, n. 3 (juin 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:3(185)

  15. Sing, Chun-Pong / Love, P. E. D. / Tam, C. M. (2012): Stock-Flow Model for Forecasting Labor Supply. Dans: Journal of Construction Engineering and Management, v. 138, n. 6 (juin 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000485

  16. Deng, Z. M. / Li, H. / Tam, C. M. / Shen, Q. P. / Love, P. E. D. (2001): An application of the Internet-based project management system. Dans: Automation in Construction, v. 10, n. 2 (janvier 2001).

    https://doi.org/10.1016/s0926-5805(99)00037-0

  17. Yang, J. / Edwards, D. J. / Love, P. E. D. (2004): Measuring the impact of daily workload upon plant operator production performance using Artificial Neural Networks. Dans: Civil Engineering and Environmental Systems, v. 21, n. 4 (décembre 2004).

    https://doi.org/10.1080/10286608412331333220

  18. Zhou, J. / Love, P. E. D. / Matthews, J. / Carey, B. / Sing, C. P. (2015): Object-oriented model for life cycle management of electrical instrumentation control projects. Dans: Automation in Construction, v. 49 (janvier 2015).

    https://doi.org/10.1016/j.autcon.2014.10.008

  19. Love, P. E. D. / Zhou, J. / Matthews, J. / Sing, M. C. P. / Edwards, D. J. (2017): System information modelling in practice: Analysis of tender documentation quality in a mining mega-project. Dans: Automation in Construction, v. 84 (décembre 2017).

    https://doi.org/10.1016/j.autcon.2017.08.034

  20. Sing, Michael C. P. / Edwards, D. J. / Liu, Henry J. X. / Love, P. E. D. (2015): Forecasting Private-Sector Construction Works: VAR Model Using Economic Indicators. Dans: Journal of Construction Engineering and Management, v. 141, n. 11 (novembre 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0001016

  21. Olaniran, O. J. / Love, P. E. D. / Edwards, D. J. / Olatunji, O. / Matthews, J. (2017): Chaos Theory: Implications for Cost Overrun Research in Hydrocarbon Megaprojects. Dans: Journal of Construction Engineering and Management, v. 143, n. 2 (février 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001227

  22. Treloar, G. J. / Love, P. E. D. / Faniran, O. O. / Iyer-Raniga, U. (2000): A hybrid life cycle assessment method for construction. Dans: Construction Management and Economics, v. 18, n. 1 (janvier 2000).

    https://doi.org/10.1080/014461900370898

  23. Love, P. E. D. / Li, H. (2000): Overcoming the problems associated with quality certification. Dans: Construction Management and Economics, v. 18, n. 2 (mars 2000).

    https://doi.org/10.1080/014461900370771

  24. Love, P. E. D. / Skitmore, M. / Earl, G. (1998): Selecting a suitable procurement method for a building project. Dans: Construction Management and Economics, v. 16, n. 2 (mars 1998).

    https://doi.org/10.1080/014461998372501

  25. Li, Heng / Love, P. E. D. (1998): Developing a theory of construction problem solving. Dans: Construction Management and Economics, v. 16, n. 6 (novembre 1998).

    https://doi.org/10.1080/014461998372015

  26. Love, P. E. D. / Mandal, P. / Li, H. (1999): Determining the causal structure of rework influences in construction. Dans: Construction Management and Economics, v. 17, n. 4 (juillet 1999).

    https://doi.org/10.1080/014461999371420

  27. Sing, C. P. / Chan, H. C. / Love, P. E. D. / Leung, A. Y. T. (2016): Building Maintenance and Repair: Determining the Workforce Demand and Supply for a Mandatory Building-Inspection Scheme. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 2 (avril 2016).

    https://doi.org/10.1061/(asce)cf.1943-5509.0000755

  28. Sing, C. P. / Love, P. E. D. / Fung, I. W. H. / Edwards, D. J. (2014): Personality and Occupational Accidents: Bar Benders in Guangdong Province, Shenzhen, China. Dans: Journal of Construction Engineering and Management, v. 140, n. 7 (juillet 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000858

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine