Effects of overtime work and additional resources on project cost and quality
Auteur(s): |
H. Li
P. E. D. Love D. S. Drew |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, mars 2000, n. 3, v. 7 |
Page(s): | 211-220 |
DOI: | 10.1108/eb021146 |
- Informations
sur cette fiche - Reference-ID
10575747 - Publié(e) le:
27.02.2021 - Modifié(e) le:
27.02.2021