Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems
Author(s): |
Heng Li
J.-N. Cao P. E. D. Love |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, September 1999, n. 5, v. 125 |
Page(s): | 347-353 |
DOI: | 10.1061/(asce)0733-9364(1999)125:5(347) |
- About this
data sheet - Reference-ID
10154958 - Published on:
11/12/2018 - Last updated on:
11/12/2018