Zhenyuan Liu
- Multi-objective optimal scheduling of automated construction equipment using non-dominated sorting genetic algorithm (NSGA-III). In: Automation in Construction, v. 143 (November 2022). (2022):
- Improved genetic algorithm based on time windows decomposition for solving resource-constrained project scheduling problem. In: Automation in Construction, v. 142 (October 2022). (2022):
- Search space decomposition for resource-constrained project scheduling. In: Automation in Construction, v. 134 (February 2022). (2022):
- Heuristic algorithm for ready-mixed concrete plant scheduling with multiple mixers. In: Automation in Construction, v. 84 (December 2017). (2017):
- Integrated scheduling of ready-mixed concrete production and delivery. In: Automation in Construction, v. 48 (December 2014). (2014):
- An effective approach with feasible space decomposition to solve resource-constrained project scheduling problems. In: Automation in Construction, v. 75 (March 2017). (2017):