Improved genetic algorithm based on time windows decomposition for solving resource-constrained project scheduling problem
Author(s): |
Zhengming Hua
Zhenyuan Liu Lijing Yang Liu Yang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, October 2022, v. 142 |
Page(s): | 104503 |
DOI: | 10.1016/j.autcon.2022.104503 |
- About this
data sheet - Reference-ID
10687146 - Published on:
13/08/2022 - Last updated on:
13/08/2022