Zhenyuan Liu
- Multi-objective optimal scheduling of automated construction equipment using non-dominated sorting genetic algorithm (NSGA-III). Dans: Automation in Construction, v. 143 (novembre 2022). (2022):
- Improved genetic algorithm based on time windows decomposition for solving resource-constrained project scheduling problem. Dans: Automation in Construction, v. 142 (octobre 2022). (2022):
- Search space decomposition for resource-constrained project scheduling. Dans: Automation in Construction, v. 134 (février 2022). (2022):
- Heuristic algorithm for ready-mixed concrete plant scheduling with multiple mixers. Dans: Automation in Construction, v. 84 (décembre 2017). (2017):
- Integrated scheduling of ready-mixed concrete production and delivery. Dans: Automation in Construction, v. 48 (décembre 2014). (2014):
- An effective approach with feasible space decomposition to solve resource-constrained project scheduling problems. Dans: Automation in Construction, v. 75 (mars 2017). (2017):