0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Liu, Shu-Shun / Utami, Putri / Budiwirawan, Agung / Arifin, Muhammad Faizal Ardhiansyah / Perdana, Fernanda Sarwatatwadhika (2023): Optimization Model of Maintenance Scheduling Problem for Heritage Buildings with Constraint Programming. In: Buildings, v. 13, n. 7 (28 June 2023).

    https://doi.org/10.3390/buildings13071867

  2. Tong Chen, Wei / Merrett, Hew Cameron / Liu, Shu-Shun / Fauzia, Nida / Liem, Ferdinan Nikson (2022): A Decade of Value Engineering in Construction Projects. In: Advances in Civil Engineering, v. 2022 (January 2022).

    https://doi.org/10.1155/2022/2324277

  3. Tong Chen, Wei / Lu, Chun Sheng / Liu, Shu-Shun / Wang, Min-Shun (2013): Measuring the Perception of Safety Among Taiwan Construction Managers. In: Journal of Civil Engineering and Management, v. 19, n. 1 (October 2013).

    https://doi.org/10.3846/13923730.2012.734852

  4. Tong Chen, Wei / Chen, Tung-Tsan / Lu, Chun Sheng / Liu, Shu-Shun (2012): Analyzing Relationships Among Success Variables of Construction Partnering Using Structural Equation Modeling: A Case Study of Taiwan's Construction Industry. In: Journal of Civil Engineering and Management, v. 18, n. 6 (November 2012).

    https://doi.org/10.3846/13923730.2012.735062

  5. Liu, Shu-Shun / Wang, Chang-Jung (2010): Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow. In: Journal of Construction Engineering and Management, v. 136, n. 12 (December 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000235

  6. Liu, Shu-Shun / Shih, Kuo-Chuan (2009): Construction rescheduling based on a manufacturing rescheduling framework. In: Automation in Construction, v. 18, n. 6 (October 2009).

    https://doi.org/10.1016/j.autcon.2009.02.002

  7. Liu, Shu-Shun / Wang, Chang-Jung (2007): Optimization model for resource assignment problems of linear construction projects. In: Automation in Construction, v. 16, n. 4 (July 2007).

    https://doi.org/10.1016/j.autcon.2006.08.004

  8. Liu, Shu-Shun / Wang, Chang-Jung (2011): Optimizing project selection and scheduling problems with time-dependent resource constraints. In: Automation in Construction, v. 20, n. 8 (December 2011).

    https://doi.org/10.1016/j.autcon.2011.04.012

  9. Liu, Shu-Shun / Wang, Chang-Jung (2012): Optimizing linear project scheduling with multi-skilled crews. In: Automation in Construction, v. 24 (July 2012).

    https://doi.org/10.1016/j.autcon.2011.12.009

  10. Liu, Shu-Shun / Wang, Chang-Jung (2008): Resource-constrained construction project scheduling model for profit maximization considering cash flow. In: Automation in Construction, v. 17, n. 8 (November 2008).

    https://doi.org/10.1016/j.autcon.2008.04.006

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine