Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow
Author(s): |
Shu-Shun Liu
Chang-Jung Wang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, December 2010, n. 12, v. 136 |
Page(s): | 1268-1278 |
DOI: | 10.1061/(asce)co.1943-7862.0000235 |
- About this
data sheet - Reference-ID
10165961 - Published on:
11/12/2018 - Last updated on:
11/12/2018