Resource-constrained construction project scheduling model for profit maximization considering cash flow

Author(s):

Medium: journal article
Language(s): English
Published in: Automation in Construction, , n. 8, v. 17
Page(s): 966-974
DOI: 10.1016/j.autcon.2008.04.006
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2008.04.006.