0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Seung-Hyun Lee

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Lee, Seung-Hak / Son, Jea-Ho / Lee, Seung-Hyun (2014): 건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발 (Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 14, n. 5 (October 2014).

    https://doi.org/10.5345/jkibc.2014.14.5.467

  2. Kwon, O-Bin / Son, Jae-Ho / Lee, Seung-Hyun (2010): 교육시설물 공사비 관리 효율화를 위한 BIM 적용방안에 관한 연구 (Study on the Application of 3D-based BIM for School Facilities to Increase Cost Management Efficiency). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 6 (December 2010).

    https://doi.org/10.5345/jkic.2010.12.6.049

  3. Park, Hyeon-Yong / Lee, Seung-Hyun / Kang, Tai-Kyoung / Lee, Yoo-Sub (2008): 설치 위치 정보를 포함한 배근시공상세도 작성 및 가공철근 자동 물량산출 시스템 개발 (Developing an Automatic System for Making a Placing Drawing and Quantity taking-off Cut and Bent Re Bar with Work Zone Information). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 8, n. 2 (April 2008).

    https://doi.org/10.5345/jkic.2008.8.2.063

  4. Ellis, Ralph D. / Pyeon, Jae-Ho / Lee, Seung-Hyun / Kim, Booil (2010): Evaluation of seal coating treatments to manage temporary pavement paint markings during highway construction. In: KSCE Journal of Civil Engineering, v. 14, n. 4 (June 2010).

    https://doi.org/10.1007/s12205-010-0461-5

  5. Hwang, Se-In / Son, Jae-Ho / Lee, Seung-Hyun (2014): Development of scheduling model for earth work using genetic algorithm. In: KSCE Journal of Civil Engineering, v. 18, n. 6 (August 2014).

    https://doi.org/10.1007/s12205-014-0398-1

  6. Kim, Byoung-Il / Lee, Seung-Hyun (2005): Comparison of bearing capacity characteristics of sand and gravel compaction pile treated ground. In: KSCE Journal of Civil Engineering, v. 9, n. 3 (May 2005).

    https://doi.org/10.1007/bf02829050

  7. Ellis, Ralph D. / Lee, Seung-Hyun (2006): Measuring Project Level Productivity on Transportation Projects. In: Journal of Construction Engineering and Management, v. 132, n. 3 (March 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:3(314)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine